26.4499' N
80.3319' E
Plot shall be demarcated by stone Signage giving the Plot No. / Block.
N.A.
Soil Filled and Compressed WBM plus with layer Bituminous on it. (Two Layers 6 + 4 Inches).
With Soil Dressing - Top finished with Tiles.
As per the specifications provided in the Sanctioned Plans.
Sewer Line and STP.
As per the specifications provided in the Sanctioned Plans.
Parks with Grass and Plants, Size of Parks as per the Specifications provided in the Sanctioned Plans. 2 benches to be provided in the Park along with sufficient street lights inside the park.
Along the Roads and in the Parks.
As per the specifications provided in the Sanctioned Plans.
N.A
STP.
Shall be carried out through the Approved Agency.
Provision of Rain Water Harvesting System shall be done as per the norms and Specifications, as per the Bye - Laws of the Competent Authority.
N.A.
N.A.
N.A.
N.A.
As per the specifications provided in the Sanctioned Plans.
No: Time Extension Letter for Objection Letter of UP RERA | Date: 19-08-2020
No: Reply Letter to Objection Letter | Date: 25-08-2020
Showing 1 blocks with 6 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
80163.48 m²
862871.68 ft²