OngoingActive

NEEL GAGAN PARK

Bareilly, Uttar Pradesh
19-06-2019Completion
OngoingType
BareillyDistrict
1500 LCost

Basic Details

Project Type:Ongoing
Project Category:Residential
Total area in round figure (Sq.mt.):14005
Project Name:NEEL GAGAN PARK
Registration Fee (in Rs.):75500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):60
District:Bareilly
Original Start Date:20-06-2014
Tehsil:Bareilly
Proposed Start Date:20-06-2014
Sanctioning Competent Authority:Not specified
Project Cost (in Lacs):1500
Proposed Completion Date:19-06-2019

Location

Latitude

28.381877

Longitude

79.462562

Bank Details

Account no.:6134002100001356
Name Of Account Holder:AAKASH BUILDTECH PRIVATE LIMITED
Bank Name:PUNJAB NATIONAL BANK
Branch Address:PILIBHIT BYPASS ROAD BAREILLY
Branch Name:PILIBHIT BYPASS ROAD BAREILLY
IFSC Code:PUNB0613400

Uploaded Documents

Registry Document In Case of Own Land

Uploaded: 13-08-2017

Registry Document In Case of Own Land

Uploaded: 13-08-2017

Registry Document In Case of Own Land

Uploaded: 13-08-2017

Authentic copy of Approval of Project

Uploaded: 13-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 13-08-2017

Affidavit

Uploaded: 13-08-2017

Project Team

Contractor Name (if any)NA
Contractor AddressNA
Architect NamePAWAN BHATT
Architect AddressP6-7 DD PURAM BAREILLY
Architect Licence NumberCA/99/25535
Structural Engineer NameNA
Structural Engineer AddressNA
Mobile number(Project Co-ordinator)9412288171

Other Details

Contractor Name (if any):NA
Contractor Address:NA
Architect Name:PAWAN BHATT
Architect Address:P6-7 DD PURAM BAREILLY
Architect Licence Number:CA/99/25535
Structural Engineer Name:NA
Structural Engineer Address:NA
Mobile number(Project Co-ordinator):9412288171