Project Area
Launch Date
Completion Date
RERA ID
26 46 27.20 N
80 54 52.56 E
YES
YES
INTERNAL DRIVEWAY IN PROGRESS WELL CONNECTED TO EXTERNAL 24 MT
IN PROGRESS
SUPPLY FROM RCC TANK FROM TERRACE TO EACH FLAT
CONNECTED TO EXISTING TRUNK SEVERLINE
THROUGH EXTERNAL DRAIN
YES
YES
YES
YES
CONNECTED TO EXISTING TRUNK SEVER LINE WHICH IS FINALLY DISPOSED TO
TROUGH PRIVATE VENDOR
PROVISION OF RAIN WATER HARVESTING
NO
YES
NEARBY DEVELOPED SCHEME
YES
PASSENGER AND CARGO LIFT TELEPHONE CONDUITING ETC
No: SANCTION COPY OF PROJECT (IN DEVELOPED LDA MANSOROVER SEC P ) SCHEME | Date: 15-01-2015
Showing 1 blocks with 6 units
Total Carpet Area
4728.00 m²
50891.72 ft²
Total Units
60
1 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3800.00 m²
40902.82 ft²