NewActive

Marbella GH18

Lucknow, Uttar Pradesh
10-05-2024
Launch Date
New
Type
20-02-2029
Completion Date

Overview

Project Area

4.0871 acres

Launch Date

10-05-2024

Completion Date

20-02-2029

RERA ID

UPRERAPRJ460592/05/2024

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)16540
Project NameMarbella GH18
Registration Fee (in Rs.)88000
AddressPLOT NO:GH18, Baghamau, Int. Town. Shalimar One World, Lucknow
Village/Locality/Sector etc.Baghamau
StateUttar Pradesh
Project Duration (In month)58
DistrictLucknow
Original Start Date-
TehsilLucknow
Proposed Start Date10-05-2024
Sanctioning Competent AuthorityLucknow Development Authority
Project Cost (in Lacs)50982
Proposed Completion Date20-02-2029

Location

Latitude

26.831224

Longitude

81.027258

Bank Details

Account Details
Name of the AccountANSDPL - COLL A/c- MARBELLA GH 18
Account Number42952561777
Bank NameState Bank of India
Branch NameCommercial Branch
Branch Address6A, Way Road, Gokhle Marg Lucknow, Uttar Pradesh 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeSBIN0004166
Branch Email Addresssbi.04166@sbi.co.in
Separate Account Details
Name of the AccountANSDPL - SEP A/c- MARBELLA GH 18
Account Number42952562657
Bank NameState Bank of India
Branch NameCommercial Branch
Branch Address6A, Way Road, Gokhle Marg Lucknow, Uttar Pradesh 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeSBIN0004166
Transaction Account Details
Name of the AccountM/S. ANS DPL TRANS A/C- MARBELLA GH18
Account Number42952563060
Bank NameState Bank of India
Branch NameCommercial Branch
Branch Address6A, Way Road, Gokhle Marg Lucknow, Uttar Pradesh 226001
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeSBIN0004166

Development Works

Demarcation of Plots

As per approved sanction plan.This is single plot rectangular shaped , having total 1 no. of entry gate and 1no. of exit gate from the 30 mtr wide front from South West Side. Site is surrounded by others plot by North East and green park area from South side.

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed or with MS Railing as per approved design. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates may of of MS Steel steel structure as per approved design are developed with boundary.

Road Work

Trimix / asphalt road will be used as per design suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath with tiles pavers or equivalent finishes as per landscape design.

Water Supply Including Drinking Water Facilities

All apartments shall be provided with domestic water for household activities and STP treated water for flushing. Ground water may also be used and user can have their individual RO system as per their requirement. The STP treated water shall also be used for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatment. after treatment ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.

Parks

There is a significant green area beside building including green parks, play areas for childrens and different recreational activities.

Tree Planting

The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity Board and consider centralized Transformer panel,LT Panel,Feeder Pillar and DG back for common service like External lighting with timer control,Pump room etc.

Community Buildings

Fully centralised AC Club House/community center is proposed on ground floor. Swimming pool and some temporary kiosks on the central atrium with sitting area of each building. Club comprises multiple facility, gym, indoor playing areas etc.

Treatment and Disposal System of Sewage and Sullage water

Separate centralized sewerage system for entire project and all towers shall be connected to STP . All Sewerage water shall go to the STP for treatment. After treatment recycled water will be used in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.

Solid Waste Management And Disposal System

Project shall have  waste segregation area. The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas and other waste shall be handed over to the government vendors for further disposal.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of  recharge pits

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex. Also timer control panels shall be used for efficient energy management.

Fire Protection And Fire Safety System

All Fire norms shall be followed as per NBC code and approval of fire department. fire sprinklers,FHC Shaft, smoke detectors with pumps are provided as per norms.

Social Infrastructure And Other Public Amenities Including Public Health Services

NA

Emergency Evacuation Services

Fire Staircase is provided in the each building, with fire resistant doors, basements have 1 (one) access and exit in case of emergency. Dedicated assembly areas are also defined in the campus. Also adequate signage shall be provided.

Other Miscellaneous Work

NA

Documents

Registry Document

No: 5396 | Date: 18-04-2015

Sale Deed

No: 8785 | Date: 06-07-2011

Registry Document

No: 9652 | Date: 24-06-2015

Sale Deed

No: 4674 | Date: 06-05-2024

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 19-03-2024

Commencement Certificate

Uploaded: 09-03-2024

Other Plan(If Any)

Uploaded: 10-04-2024

Proforma of Application Form

Uploaded: 09-03-2024

Proforma of Allotment Letter

Uploaded: 18-03-2024

Proforma of Conveyance Deed

Uploaded: 09-03-2024

Waste Disposal Plan

Uploaded: 09-03-2024

Water Supply Plan

Uploaded: 09-03-2024

Electricity Supply Plan

Uploaded: 09-03-2024

Development Work Plan

Uploaded: 09-03-2024

Affidavit

Uploaded: 09-03-2024

CA CERTIFICATE

Uploaded: 18-03-2024

ARCHITECT CERTIFICATE

Uploaded: 19-03-2024

ENGINEERS CERTIFICATE

Uploaded: 19-03-2024

Other

Uploaded: 10-04-2024

Proforma of Agreement for Sale

Uploaded: 09-03-2024

Permits

Orignal Permit NoGroup Housing/10709/LDA/BP/23-24/3709/11012024
Orignal Permit Date06-03-2024
Valid Upto05-03-2029
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto05-03-2032
End Date20-02-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailOpen
Orignal Permit NoGroup Housing/10709/LDA/BP/23-24/3709/11012024
Orignal Permit Date06-03-2024
Valid Upto05-03-2029
Revalidated Permit NoGroup Housing/10709/LDA/BP/23-24/3709/11012024
Revalidated Permit Date06-03-2024
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto05-03-2032
End Date20-02-2029
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Mr. Arvind Bahl (RAJ Krishna Construction Company Pvt Ltd)
Contractor AddressS-28, Greater Kailash-II, New Delhi-110048
Architect NameShivam Srivastava
Architect AddressVibhuti Khand Gomti Nagar, Lucknow
Architect Licence NumberCA/2010/50742
Structural Engineer NameMr. Pankish Goel (TPC Technical Projects Consultants Pvt. Ltd.)
Structural Engineer AddressB-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator)9236023650

Land Details

AFS

Showing 4 blocks with 274 units

Property Summary

Total Carpet Area

58758.36

632469.11 ft²

Total Units

528

3 different types

Blocks & Floors

4

34 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:111.28
Balconies:1002
Parking ratio:0.00 per unit

Block Tower A

69 units

Block TOWER B

69 units

Block TOWER C

67 units

Block TOWER D

69 units

Khasra Details

Total Area

16540.13

178036.31 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot NoPart of Khasra no 162, 164, 165, 166, 167, 168, 169, 170, 172, 173
Area(In Sq. Mt.)16540.13

Other Details

Contractor Name (if any)Mr. Arvind Bahl (RAJ Krishna Construction Company Pvt Ltd)
Contractor AddressS-28, Greater Kailash-II, New Delhi-110048
Architect NameShivam Srivastava
Architect AddressVibhuti Khand Gomti Nagar, Lucknow
Architect Licence NumberCA/2010/50742
Structural Engineer NameMr. Pankish Goel (TPC Technical Projects Consultants Pvt. Ltd.)
Structural Engineer AddressB-74, Sector-57, Noida-201301
Mobile number(Project Co-ordinator)9236023650