This is one plot polygon shaped abutting 24mtr internal road from East side. Site has one entrance and one exit. Site is surrounded by other plots from North, Village from West and green area from South
1.8 - 2.1m high and 200 mm thick Boundary wall designed. Brick Work of 9inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.
Trimix finish/ bitumen will be used as per design suggested by the Architect for internal road.
NA
All apartments shall be provided with domestic water for household activities. The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created on terrace. Separate tanks are provided for fire water.
Centralized Sewerage system already provided at township and shall be connected through projects. All Sewerage water shall be go to the STP for treatment. after treatment ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.
Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municipal drain line.
There are significant green area including green parks,Tree Boulevard, Green Mounds, play areas for childrens and different recreational activities at masterplan level.
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommended in the landscape in order to maintain greenery and natural view.
We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting etc.
NA
Centralized Sewerage system already provided at township and shall be connected through projects. All Sewerage water shall be go to the STP for treatment. after treatment ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connect with the Municipal sewerage system.
Project shall have waste segregation area. The solid waste shall be encouraged for segregation. Dustbins shall be provided for segregated waste in the common areas within the campus and other waste shall be handed over to the government vendors for further disposal.
A well designed rain water harvesting system shall be provided for the whole building complex to conserve water by ensuring adequate nos. of recharge pits
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. Also timer controlled panels shall be used for efficient energy management.
All Fire norms shall be followed as per NBC Part 4 code and approval of fire department. fire sprinklers,FHC with pumps are provided as per norms.
NA
Fire Staircase is provided in the each building,Dedicated assembly areas defined in the campus. Adequate signage is also provided.
NA
Showing 4 blocks with 28 units
Total Area
15013.81 m²
161607.15 ft²
Total Units
469
1 different types
Blocks & Floors
4
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
30060.00 m²
323562.83 ft²