25'18'29.28''N
82'58'3.02''E
Lat-25_18_30.05"N & Lang-82_57_57.69_E, Lat-25_18_32.49_N & Lang-82_57_57.80_E, Lat-25_18_32.33_N & Lang-82_57_99.09_E, Lat-25_18_29.92_N & Lang-82_57_58.67_E
The Promoter has provided 9" Brick work with RCC frame Boundary Wall.
The promoter has provided Road work 60mm thick paver block laid over sand bed over rammed earth.
Interlocking Pavers on PCC & compacted surface .
The Promoter provided 2 nos. borewell with O.H. Tanks.
Underground system using UPVC(SN-4) sewer pipes.
Underground system using RCC.
The promoter has provided green open area for Parks.
The promoter has provided Trees & flowers planted in front of every row house.
The promoter has provided 400 KVA Transformer , Metel pols using LED lights for street lighting.
The promoter has provided Community Hall, fully equiped gymnasium, swimming pool, synthetic badminton court in the project.
Sewage drains are connected to New main sewage line of the City.
The Solid Waste Management And Disposal System has been developed and the same are collected by Society and disposed by Municipality.
Rainwater Harvesting system has been provided with dedicated borewell for water conservation in the Project.
The Solar panels has been provided on terrace. It is attached to grid through common society meter.
Not Applicable for Row Houses.
Community Hall, Fully equiped Gymnasium, Swimming pool, Synthetic badminton court Table tennis court, Adequate facility for Social gathering of residents, Close to numerous Hospitals like BHU, Homi Bhabha Cancer Hospitals are the additional amenities of the project.
Balcony will also be used for evacuation.Assembly points areas will be demarcated for earthquake and other possible disasters.
Other Miscellaneous work has been Completed.
Total Area
7243.00 m²
77962.93 ft²
Processing Time
1047 days
From application to approval
15-11-2021
27-09-2024