OngoingActive

LOHIA ENCLAVE - PHASE-1

Gorakhpur, Uttar Pradesh
01-05-2015Launch Date
OngoingType
UPRERAPRJ9365RERA ID
29-04-2018Completion Date

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)51200
Project NameLOHIA ENCLAVE - PHASE-1
Registration Fee (in Rs.)261000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)36
DistrictGorakhpur
Original Start Date01-05-2015
TehsilGorakhpur
Proposed Start Date01-05-2015
Sanctioning Competent AuthorityGorakhpur Development Authority
Project Cost (in Lacs)14066
Proposed Completion Date29-04-2018

Location

Latitude

26.70960

Longitude

83.41013

Bank Details

Account no.153210100068074
Name Of Account HolderSECRETARY GDA, GORAKHPUR
Bank NameANDHRA BANK
Branch AddressDEORIA BYE PASS ROAD, GORAKHPUR
Branch NameTARAMANDAL
IFSC CodeANDB0001532

Development Works

Demarcation of Plots

All building blocks have been demarcated at site and construction of building work is almost complete

Boundary Wall

boundary wall has been constructed

Road Work

Bituminous road work consisting of 7.5 m, 9.0 m and 12.0 m width has been proposed and road work is in progress

Footpaths

road side footpath ( interlocking Tiles) is being constructed

Water Supply Including Drinking Water Facilities

potable water shall be supplied from bored well. Water shall be pumped, stored in UGT and pumped through anetwork of pipes to various blocks

Sewer System

sewerage system consists of np-3 pipes of varying diameter as per design

Drain

R.C.C. storm water drains of different sizes have been proposed, and work is in progress

Parks

Parks have been provided as per layout. Boundary wall has been constructed and parks are being developed

Tree Planting

Trees have proposed to be planted within open spaces and parks. Plantation will be done after development work is over

Design For Electric Supply Including Street Lighting

Electrical load as per UPPCL shall be got sanctioned, installed and handed over to UPPCL for maintenance

Community Buildings

N/A

Treatment and Disposal System of Sewage and Sullage water

Sewage is being treated primarily at block level through septic tank, and this partially treated effluent will finally will be treated at STP

Solid Waste Management And Disposal System

garbage collection centres have provisioned and Municipal corporation will handle the garbage

Water Conservation System

N/A

Energy Management System Including Use of Renewable Energy

N/A

Fire Protection And Fire Safety System

N/A

Social Infrastructure And Other Public Amenities Including Public Health Services

N/A

Emergency Evacuation Services

N/A

Other Miscellaneous Work

N/A

Documents

Extract of Khatauni

No: 1423-1428 | Date: -

Details of Encumbrances

Commencement Certificate

Uploaded: 06-07-2018

CA CERTIFICATE

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Registry Document In Case of Own Land

Uploaded: 11-08-2017

Proforma of Application Form

Uploaded: 11-08-2017

Proforma of Allotment Letter

Uploaded: 11-08-2017

Proforma of Conveyance Deed

Uploaded: 11-08-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 11-08-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 11-08-2017

Waste Disposal Plan

Uploaded: 11-08-2017

Electricity Supply Plan

Uploaded: 11-08-2017

Water Supply Plan

Uploaded: 11-08-2017

Affidavit

Uploaded: 11-08-2017

Legal Document of Agreement in Case of other Land

Uploaded: 02-05-2018

Permits

Orignal Permit NoLOHIAENCLAVE/PH-1/02032015
Orignal Permit Date02-03-2015
Valid Upto01-03-2020
Revalidated Permit NoLOHIAENCLAVE/PH-1-2-3/11032016
Revalidated Permit Date11-03-2016
Revalidated Permit Valid Upto10-03-2021
Permit Extendable Upto10-03-2024
End Date29-04-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Maa Vaishno construction co
Contractor AddressHIG-223, Siddharth Enclave, Gorakhpur
Architect NameANUPAM AGGRAWAL ( M/s V Design)
Architect AddressA-15, Rapti Nagar, Phase-II, Chargawan, Gorakhpur
Architect Licence Number94/16911
Structural Engineer NameNeeraj & Associates
Structural Engineer AddressAyodhya Das Compound, Bank Compound, Gorakhpur
Mobile number(Project Co-ordinator)9628372026

Land Details

AFS

Showing 41 blocks with 205 units

Property Summary

Total Area

39879.06 m²

429254.21 ft²

Total Units

656

2 different types

Blocks & Floors

41

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:60.79 m²
Balconies:369
Parking ratio:0.00 per unit

Block 1

5 units

Block 2

5 units

Block 3

5 units

Block 4

5 units

Block 5

5 units

Block 6

5 units

Block 7

5 units

Block 8

5 units

Block 9

5 units

Block 10

5 units

Block 11

5 units

Block 12

5 units

Block 13

5 units

Block 14

5 units

Block 15

5 units

Block 16

5 units

Block 17

5 units

Block 18

5 units

Block 19

5 units

Block 20

5 units

Block 21

5 units

Block 22

5 units

Block 23

5 units

Block 24

5 units

Block 25

5 units

Block 26

5 units

Block 27

5 units

Block 28

5 units

Block 29

5 units

Block 30

5 units

Block 31

5 units

Block 32

5 units

Block 33

5 units

Block 34

5 units

Block 35

5 units

Block 36

5 units

Block 37

5 units

Block 38

5 units

Block 39

5 units

Block 40

5 units

Block 41

5 units

Other Details

Contractor Name (if any)Maa Vaishno construction co
Contractor AddressHIG-223, Siddharth Enclave, Gorakhpur
Architect NameANUPAM AGGRAWAL ( M/s V Design)
Architect AddressA-15, Rapti Nagar, Phase-II, Chargawan, Gorakhpur
Architect Licence Number94/16911
Structural Engineer NameNeeraj & Associates
Structural Engineer AddressAyodhya Das Compound, Bank Compound, Gorakhpur
Mobile number(Project Co-ordinator)9628372026