All building blocks have been demarcated at site and construction of building work is almost complete
boundary wall has been constructed
Bituminous road work consisting of 7.5 m, 9.0 m and 12.0 m width has been proposed and road work is in progress
road side footpath ( interlocking Tiles) is being constructed
potable water shall be supplied from bored well. Water shall be pumped, stored in UGT and pumped through anetwork of pipes to various blocks
sewerage system consists of np-3 pipes of varying diameter as per design
R.C.C. storm water drains of different sizes have been proposed, and work is in progress
Parks have been provided as per layout. Boundary wall has been constructed and parks are being developed
Trees have proposed to be planted within open spaces and parks. Plantation will be done after development work is over
Electrical load as per UPPCL shall be got sanctioned, installed and handed over to UPPCL for maintenance
N/A
Sewage is being treated primarily at block level through septic tank, and this partially treated effluent will finally will be treated at STP
garbage collection centres have provisioned and Municipal corporation will handle the garbage
N/A
N/A
N/A
N/A
N/A
N/A
Showing 41 blocks with 205 units
Total Area
39879.06 m²
429254.21 ft²
Total Units
656
2 different types
Blocks & Floors
41
4 floors across all blocks
Parking
0
0 garages, 0 open