ALL THREE BLOCKS HAVE BEEN DEMARCATED AT SITE, AND WORK IN IN PROGRESS.
BOUNDARY WALL IS PART OF PROJECT, AND WILL BE CONSTRUCTED TOWARDS THE END OF PROJECT.
INTERNAL ROADS WILL BE CONSTRUCTED, ONCE THE BUILDING WORK IS COMPLETED.
FOOTPATHS ALONG WITH INTERNAL ROADS WILL BE CONSTRUCTED, ONCE THE BUILDING WORK IS COMPLETED.
POTABLE DRINKING WATER FACILITIES WILL BE PROVIDED IN PROJECT.
INTERNAL SEWER LINES ON MODERN LINES WILL BE LAID UPON COMPLETION OF BUILDING WORK.
INTERNAL DRAIN WILL BE CONSTRUCTED ALONG WITH ROAD WORK.
PARK AS PER ATTACHED LAYOUT WILL BE DEVELOPED.
TREES WILL BE PLANTED TOWARDS THE END OF PROJECT IN THE AREA SHOWN
AS PER APPROVAL FROM U.P. POWER CORPORATION
RESIDENT CLUB ( APPROX. 225 SQM ) AND PLAY-ZONE ( APPROX 250 SQM ) HAVE BEEN PROVIDED AT GROUND FLOOR
SULLAGE WATER AND SEWAGE SHALL BE TREATED IN S.T.P. AT SITE ITSELF
AS PER ATTACHED DRAWING
RAIN WATER SYSTEM
PROVIDED
PROVIDED
N/A
YES
N/A
Showing 3 blocks with 48 units
Total Area
16107.60 m²
173380.60 ft²
Total Units
192
2 different types
Blocks & Floors
3
8 floors across all blocks
Parking
0
0 garages, 0 open