27'11'51.94'N
77'55'29.09'E
Plots will be demarcated and leveled as per layout plan approved by Agra Development Authority with state-of-art survey equipments. The Project Land will be demarcated by Boundary Walls.
A 6 to 8 feet high compound wall, wind / Earthquake resistant
Flexible Pavement will be constructed on the approved road plan of colony. The bituminous road will be constructed over a well compacted sub-grade and granular layer/s.
4" Paver blocks will be laid over the walking areas, along side park and other
Ground Water is pumped to common Tank. The water thereon is supplied to terrace tanks of villas and the connection up to the front of plots, through PVC pipes of ISI Mark. The Supply of water will be for domestic use only
Under Ground Sewer lines ( Hume Pipes) will be laid across the project as per approved sewer layout. The sewer is designed to assist smooth exit through proper slopes and alignment, and cater for the domestic use of all the Plots/Villas of Project. The sewer line from the project is then connected to the Local Authorities main sewer line. Inspection chambers will be installed at suitable distance.
Lined, covered/open drain, and cross drains ,with drain covers resistant to traffic and weather. A, B and U type Drains.
2 lush green parks with play area for kids. With Tree Plantation along the park boundaries. The parks landscape and location will be as per approved map.
Tree Plantation will be done along the park boundary, project boundary and other suitable locations. The long lasting breeds of Plants will be planted to add shade and beauty in the project compound
The electric load design will be as per the authorities prevailing norms to cater for the projects demand. Aesthetically appealing street lights of sufficient height and lumens will be installed to cater for all the common zones of project requiring light.
Not Applicable
Not Applicable
Dalab Ghar will be constructed. In addition the Dustbins will be placed at all suitable location, for discharge to the collection vehicle of local body
Storm water drain shall be Provided. Storm water from Roof,Roads and other impermeable areas shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit to recharge the Ground water and overflow shall be connect with authorities drain line
All the necessary arrangements will be done to ensure " Reduce-Reuse-Recycle" . Low flow taps and Low consumption electric units will be installed .
Not Applicable
Not Applicable
Not Applicable
All Necessary and Miscellaneous arrangements will be made at site w.r.t to project requirement
Total Area
11900.00 m²
128090.41 ft²