OngoingActive

KAMLA MANNSIONS

Bareilly, Uttar Pradesh
01-04-2015
Launch Date
Ongoing
Type
30-06-2019
Completion Date

Overview

Project Area

0.6323 acres

Launch Date

01-04-2015

Completion Date

30-06-2019

RERA ID

UPRERAPRJ4503

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)2559
Project NameKAMLA MANNSIONS
Registration Fee (in Rs.)18000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)51
DistrictBareilly
Original Start Date01-04-2015
TehsilBareilly
Proposed Start Date01-04-2015
Sanctioning Competent AuthorityBareily Development Authority
Project Cost (in Lacs)2500
Proposed Completion Date30-06-2019

Location

Latitude

28.222884

Longitude

28.222791

Bank Details

Account no.37046094244
Name Of Account HolderSPVP Infra Developers ESCROW AC
Bank NameState Bank Of India
Branch Address148 Civil Lines, Bareilly.
Branch NameSpecialised Commercial Branch
IFSC CodeSBIN0017644

Development Works

Demarcation of Plots

This is a plot having One (1) main gate having grand entrance from the 18m wide front road and Site is surronded by other plots on three sides.

Boundary Wall

1.8 - 2.1m high Boundary wall made of RCC work in column and beamwith brick work is used as per design. Entrance gates is created at the main entrance.

Road Work

80mm CC Paver Tile Road

Footpaths

NA

Water Supply Including Drinking Water Facilities

Municipal water supply and ground water may also be used. Also end user shall use their individual RO system as per their requirement. Overhead tanks is provided on each building terrace for distribution through gravity

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and oveflow from the STP shall be connect with the Municiple sewarage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.

Parks

There is one main Lawn in the front towards road side. There are also green plantations adjioning to the boundary wall on three sides of the Appartment.

Tree Planting

"There are varied type of trees povided in site which are Foxtail Palm, Tabubei, Phycus, Phoenix palm etc."

Design For Electric Supply Including Street Lighting

We have design the system as per local electricity Board and consider centralized Transformer,LT Panel and DG backup for common service like External lighting,STP, Lifts,Pumps etc.

Community Buildings

NA

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening and flushing system and oveflow from the STP shall be connect with the Municiple sewarage system.

Solid Waste Management And Disposal System

"There is a proper garbage collection area provided for the solid waste management."

Water Conservation System

A well designed rain water harvesting system is provided for the whole building complex to conserve water.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.

Fire Protection And Fire Safety System

Since the building is less than 45m in height all the fire norms shall be followed as NBC and approval of fire department

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, to fill the domestic overhead tank. Water for domestic use go down through gravity from domestic tanks. All Sewgage shall go to the STP for recycling the water. Storm water from Roof, Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.

Emergency Evacuation Services

Fire Escape Staircase (1.5 meter wide) is provided for evacuation of people. Balcony will also be used for evacuation. Assembly points areas will be demarcated for earthquake and other possible disasters

Other Miscellaneous Work

Finishing and other Miscellaneous works

Documents

Extract of Khatauni

No: 1417-1422 | Date: -

Extract of Khatauni

No: 1417-1422 | Date: -

Registry Document

No: 4401 | Date: 21-11-1966

Registry Document

No: 3458 | Date: 18-12-1972

Other Plan(If Any)

Other Plan(If Any)

Proforma of Allotment Letter

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 30-07-2018

Commencement Certificate

Uploaded: 30-07-2018

Proforma of Application Form

Uploaded: 06-07-2018

Waste Disposal Plan

Uploaded: 30-01-2019

Water Supply Plan

Uploaded: 30-01-2019

Electricity Supply Plan

Uploaded: 06-07-2018

Development Work Plan

Uploaded: 30-01-2019

Affidavit

Uploaded: 30-07-2018

CA CERTIFICATE

Uploaded: 06-07-2018

ARCHITECT CERTIFICATE

Uploaded: 06-07-2018

ENGINEERS CERTIFICATE

Uploaded: 06-07-2018

Commencement Certificate

Uploaded: 29-07-2017

Commencement Certificate

Uploaded: 29-07-2017

Commencement Certificate

Uploaded: 29-07-2017

Details of Encumbrances

Uploaded: 29-07-2017

Registry Document In Case of Own Land

Uploaded: 29-07-2017

Affidavit

Uploaded: 29-07-2017

Affidavit

Uploaded: 29-07-2017

Registry Document In Case of Own Land

Uploaded: 29-07-2017

Permits

Orignal Permit No127/2/GH/13
Orignal Permit Date10-06-2014
Valid Upto09-06-2019
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto09-06-2022
End Date30-06-2019
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameAnupam Saxena
Architect AddressB-340 Rajendra Nagar, Bareilly(UP).
Architect Licence NumberCA 90/13235
Structural Engineer NameBraj Pal Singh
Structural Engineer AddressA- 84 Vaibhav SunCity Vistaar, Bareilly(UP).
Mobile number(Project Co-ordinator)9897024689

Land Details

AFS

Showing 1 blocks with 28 units

Property Summary

Total Carpet Area

5137.00

55294.15 ft²

Total Units

69

2 different types

Blocks & Floors

1

7 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:74.45
Balconies:70
Parking ratio:0.00 per unit

Block 1

28 units

Khasra Details

Total Area

4280.00

46069.49 ft²

2 plots
Plot
TypePlot
Khasra/Plot No793
Area(In Sq. Mt.)1240
Plot
TypePlot
Khasra/Plot No790
Area(In Sq. Mt.)3040

Other Details

Contractor Name (if any)Not specified
Contractor AddressNot specified
Architect NameAnupam Saxena
Architect AddressB-340 Rajendra Nagar, Bareilly(UP).
Architect Licence NumberCA 90/13235
Structural Engineer NameBraj Pal Singh
Structural Engineer AddressA- 84 Vaibhav SunCity Vistaar, Bareilly(UP).
Mobile number(Project Co-ordinator)9897024689