It has been done with brick work according to the plan
already started will be completed October -2019 with plinth beam, rcc column with 230 mm brick work
will be completed before February-2020 and it to be done concrete road with M-25 grade concrete
will be completed before June-2020 and it to be done with M-25 grade 50mm thick paver block
will be completed before October-2020 and use ground water through bore wall which will be connected with 320 KL under ground water tank, which is already located in phase-I also use 50mm via UPVC pipeline for drinking water to be connected with phase-I
will be completed before December-2020 and use 450 MM concrete Hume pipe and it will be connected with phase-I STP line.
will be completed before December-2020 and use 300 MM concrete pipe connected with rain harvesting system as per mention in plan.
will be completed before October-2021 and to be provided in phase-I project it has been already developed.
will be completed before October-2021 and to be done across the boundary wall. Parallel in footpath.
will be completed December-2020. Electric supply connected (through 260 Sq. MM armed cable) with 1000 KVA and this is situated at phase-I. Street Light to be provided with 7 mtr. height MS pole and 45 W capacity LED light.
already provided in exiting building society know as jasmine grove and area of community 5200 sq ft.
connecting with Group housing society jasmine grove it has been already operational. STP (320 KLD capacity ) is already provide in phase and to be connected with phase-II.
connecting with Group housing society jasmine grove it has been already operational. Machinery is already provided in phase-I and use for phase-II also.
will be completed before December-2021. STP treated water use for construction and gardening work through 50 SQ MM GI pipe.
It is not applicable because we are provide plot only.
It is not applicable because we are provide plot only.
not provided at all
provision provided at phase-I park area and it is already developed.
not provided.
Showing 1 blocks with 3 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
10979.97 m²
118187.30 ft²