28'34'54.76'N
77'26'2.74'E
Demarcation of the plot is completed by appointed survey consultant
Boundary wall is proposed to be constructed as per the survey drawing and architectural drawing
Yes, RCC Trimix Road with Kerb Stone on Sides and Stone Paving in front of Towers.
All foot paths will be constructed as per the architectural site plan and landscape drawing
Yes, Water Supply from Authority further water to be collected in Under Ground Water reservoirs Terrace Tanks, equipped with Hydro Pneumatic pumps with GI rings and risers
RCC hume pipe with Manhole ,Chambers and Collection chamber and connections with Authority Sewer System.
drains are provided in the entire open area that carries water to 4 rain water harvesting chambers provided at each corner on the site
parks in the form of open/green area is provided at the podium level which is 40 percent of the plot area i.e. 4015 sqmt
As per MoEFCC norms, no. of trees required: = 1 Hectare/50 Trees = 1.003 × 50 = 50 Trees Trees Proposed = 65 Trees
Electric supply and Street lighting will be developed as per the design provided by the architect and appointed consultant considering site requirements
Community Building space is provided at stilt and 1st floor level with areas 297 sqm and 543 sqm respectively, which makes the total community area as 840 sqm
Proposed STP of capacity i.e. 162 KLD will be installed for treatment of wastewater. After the treatment of 135 KLD sewage, 108 KLD treated water will be generated which will be entirely used for horticulture & flushing.
Following arrangements will be made at the site in accordance to Solid Wastes Management Rules, 2016. a) 60% bio-degradable waste b) 30% non-bio degradable c) 10% inert waste The solid waste will be segregated at source & collected through trained employed personals. Dedicated covered and isolated site for storage of wastes. Adequate number of colored bins (green, blue & dark grey) separate for bio-degradable and non-biodegradable are proposed to be provided at the strategic location within site. STP sludge is proposed to be used for horticultural purposes as a manure. Horticultural Waste is composted and used for gardening purposes. Organic waste converter will be installed to convert bio-degradable wastes into manure. The manure will be used in horticulture.
Rain water harvesting potential from Green Area = Green area × Maxm monthly rainfall(m × Runoff Coefficient for landscape area) = 2,450.156 × 0.090 x 0.1 = 22.05 m3 Rain Water Harvesting potential from paved area = 5926.55 × 0.090 × 0.7 = 373.37 m3 Total runoff load for 30 days = 22.05 + 373.37 = 395.87 m3 Total runoff project site for 3 days = 395.87/10 m3 = 38.587 m3 Taking length breadth and height of harvesting tank as 2.2m, 2.5m and 3m: Volume of the tank = 2 ×2 ×4 = 16 m3 Number of tanks required = 38.587/9 = 2.4say 2 Tanks No of tanks Proposed = 4 *Tanks proposed for the collection of runoff from paved area will be equipped with Oil & Grease separator.
Power requirement for the project is 1,329.02 kW . 2 transformer of total capacity 1575 kVA (2 x 630 + 1 x 315 KVA) will be provided. Source of power will be Noida Power Company Limited (NPCL) 2 Nos. of DG sets of total capacity 320 kVA (2×160 kVA) will be provided for power back up. Silent DG sets are proposed to reduce the noise level and CPCB norms will be complied to check the pollution. Monitoring of the DG Sets (stack emission) will be done quarterly. Height of the stacks will be 114 meters from the ground level, and 6m from the rooftop, the height of the highest building is 108 m.
The fire protection system for the building is to be designed as per the provisions of National Building Code - 2005 and the directions of local fire service authority. In addition to above, the fire extinguisher system is to be design in accordance with IS: 2190. Height of the building is 106.8 m. Fire NOC has been obtained. Fire Fighting facilities: Hose reel, Landing valve , Wet riser or F.B Inlet on each floor according to the standards. Fire extinguisher on each floor according to IS - 2190 . Automatic sprinkler system on entire building. Automatic fire detection & alarm system (being taken care by Electrical Consultant) Yard hydrants on the periphery of the building. Public Address and Communication System (being taken care by Electrical Consultant) Alternate source for fulfilling the electricity requirement. One Lift with the provision of firemen switch. Mechanical ventilation in basement.
Social infrastructural space is provided at stilt and 1st floor level with areas 297 sqm and 543 sqm respectively, which makes the total community area as 840 sqm
Fire staircase is provided in each of the two towers for emergency evacuation as per the NBC guidelines and 7.5m wide fire tender path has been provided for fire tender movement in case of emergency
Dedicated separate entry and exit has been proposed to enter the premises for better security and vehicular movement
Showing 2 blocks with 183 units
Total Area
32162.00 m²
346188.55 ft²
Total Units
364
3 different types
Blocks & Floors
2
31 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
10030.00 m²
107961.92 ft²