OngoingActive

Hillston By URBTech- Phase 1-Tower E&F

Gautam Buddha Nagar, Uttar Pradesh
30-01-2024Completion
OngoingType
Gautam Buddha NagarDistrict
8880 LCost

Basic Details

Project Type:Ongoing
Project Category:Residential
Total area in round figure (Sq.mt.):5382
Project Name:Hillston By URBTech- Phase 1-Tower E&F
Registration Fee (in Rs.):32000
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):78
District:Gautam Buddha Nagar
Original Start Date:04-09-2013
Tehsil:Gautam Buddha Nagar
Proposed Start Date:01-08-2017
Sanctioning Competent Authority:Noida Authority
Project Cost (in Lacs):8880
Proposed Completion Date:30-01-2024

Location

Latitude

28.5557265

Longitude

77.3896671

Bank Details

Account no.:201000846795
Name Of Account Holder:GOLF GREEN BUILDCON PRIVATE LIMITED
Bank Name:Indusind bank
Branch Address:BARAKHAMBA ROAD, NEW DELHI
Branch Name:BARAKHAMBA ROAD
IFSC Code:INDB000005

Development Works

Demarcation of Plots

As per location plan

Boundary Wall

Work has been started

Road Work

as per location plan

Footpaths

As per location plan

Water Supply Including Drinking Water Facilities

Available as per approved plan

Sewer System

As per development plan

Drain

as per development plan

Parks

as per development plan

Tree Planting

As per Noida Authority norms

Design For Electric Supply Including Street Lighting

As per Noida Authority and Electricity board

Community Buildings

as per sanctioned layout plan

Treatment and Disposal System of Sewage and Sullage water

as per sanctioned layout plan

Solid Waste Management And Disposal System

As per norms

Water Conservation System

As per development plan

Energy Management System Including Use of Renewable Energy

As per environment authority approval

Fire Protection And Fire Safety System

As per Fire Department norms

Social Infrastructure And Other Public Amenities Including Public Health Services

As per sanctioned layout

Emergency Evacuation Services

As per fire department norms

Other Miscellaneous Work

As per sactioned plan

New Documents

Lease Deed

No: 5076 | Date: 19-10-2012

Uploaded Documents

Proforma of Conveyance Deed

Details of Encumbrances

Uploaded: 25-06-2018

Commencement Certificate

Uploaded: 20-06-2018

Proforma of Application Form

Uploaded: 20-06-2018

Proforma of Allotment Letter

Uploaded: 20-06-2018

Electricity Supply Plan

Uploaded: 25-06-2018

Affidavit

Uploaded: 20-06-2018

Permits

Orignal Permit NoIV-1409/692
Orignal Permit Date04-09-2013
Valid Upto03-09-2023
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto-
End Date31-07-2023
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra Detail-

Project Team

Contractor Name (if any)N/A
Contractor AddressN/A
Architect NameN/A
Architect AddressN/A
Architect Licence NumberN/A
Structural Engineer NameN/A
Structural Engineer AddressN/A
Mobile number(Project Co-ordinator)9711170435

Project Land Details

AFS

Showing 2 blocks with 40 units

Property Summary

Total Area

12162.76

130918.73 ft²

Total Units

148

3 different types

Blocks & Floors

2

20 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:82.18
Balconies:133
Parking ratio:0.00 per unit

Block E

20 units

Block F

20 units

Khasra Details

Total Area

24000.00

258333.60 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:01-01-SC-B1
Area(In Sq. Mt.):24000

Other Details

Mobile number(Project Co-ordinator):9711170435