Part Area covered with boundary wall made with bricks.
"RCC/ Black Top roads will be provided within the project as per the requirement "
levelleved, some part is cemented and some part have interlocking tiles
raw water supplied from overhead tank , which are filled by ground water through submersible pump. This raw water needs to be treated through RO by Flat Buyers before consuming . RO not in Builder scope.
Under ground system outside building connected to septic tank which is further connected to Main Govt. Sewer Line outside the Project.
terace water will go to water harvesting pits. Roads, Side n front drain will lead excess water outside the project
in front one park has been developed along with plantation and sitting area.
trees has been planted inside and outside the project
HT line shall be taken from UPPCL, converted to LT supply with in house transformers and switching system. Street lights shall be LED based
NA
sewage and sullage water will be drained out through internal/underground piplenes connected to septic tank and further connected to main Govt. Sewer line outside the project
Kitchen and other caste shall be collected manually by the agency assigned for housekeeping and shall be disposed as per regulation of waste management.
water Harvesting pits have been developed for water Conservation.
Top two floor will be provided for Solar heating water .
fire safety equipments and measures have been provided as per Fire Norms Applicable
Retail shops are be provide as part of commercial area to be sold separately by developers.
Stairs has been provided as approved by fire department
as per plan
Showing 1 blocks with 118 units
Total Area
1644036.59 m²
17696245.45 ft²
Total Units
29997
4 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3272.54 m²
35225.29 ft²