NewActive

GULSHAN DYNASTY MORADABAD

Moradabad, Uttar Pradesh
31-08-2027Completion
NewType
MoradabadDistrict
31102 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):49903
Project Name:GULSHAN DYNASTY MORADABAD
Registration Fee (in Rs.):255500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):50
District:Moradabad
Original Start Date:-
Tehsil:Moradabad
Proposed Start Date:01-07-2023
Sanctioning Competent Authority:Moradabad Development Authority
Project Cost (in Lacs):31102
Proposed Completion Date:31-08-2027

Location

Latitude

28.824259

Longitude

78.689085

Bank Details

Account Details
Name of the Account:Gulshan Homz Private Limited Collection A/C Gulshan Dyanasty Moradabad
Account Number:777705019001
Bank Name:ICICI BANK LTD
Branch Name:MORADABAD
Branch Address:ICICI BANK LTD PLOT NO 409 MOHALLA CHAWANI NEAR MAHILA POLICE STATION, CIVIL LINE MORADABAD
Branch State:Uttar Pradesh
Branch District:Moradabad
IFSC Code:ICIC0000190
Separate Account Details
Name of the Account:Gulshan Homz Private Limited Separate A/C For Gulshan Dynasty Moradabad
Account Number:777705019002
Bank Name:ICICI BANK LTD
Branch Name:Moradabad
Branch Address:ICICI BANK LTE PLOTE NO 409 MOHALLA CHAWANI NEAR MAHILA POLICE STATION, CIVIL LINES, MORADABAD
Branch State:Uttar Pradesh
Branch District:Moradabad
IFSC Code:ICIC0000190
Transaction Account Details
Name of the Account:Gulshan Homz Private Limited Transaction A/C For Gulshan Dynasty Moradabad
Account Number:777705019003
Bank Name:ICICI BANK LTD
Branch Name:MORADABAD
Branch Address:ICICI BANK LTD PLOT NO 409 MOHALLA CHAWANI NEAR MAHILA POLICE STATION, CIVIL LINES, MORADABAD
Branch State:Uttar Pradesh
Branch District:Moradabad
IFSC Code:ICIC0000190

Development Works

Demarcation of Plots

As per lease plan.

Boundary Wall

2.4m high boundary wall. Consists of brickwork with stone cladding up to 1.5m Form 1.5m to 2.4m , is constructed out of MS members.

Road Work

7.5 m wide internal pathway finished in a combination of stone slabs and green scaping.

Footpaths

stone paving as per landscape architect s intent.

Water Supply Including Drinking Water Facilities

Municipal water supply is collected in an underground storage reservoir. Underground storage of water is also required and reserve for firefight purpose. It is proposed to provide static storage for firefighting as per the present requirement of NCB. To prevent the stagnation of the water in the static storage tank, water will overflow into the storage chamber for the domestic requirement. This system would ensure the availability of static storage for firefighting all the times. It is proposed to provide 01 day storage for total water requirement . Over head storage tanks are proposed to be placed on the terrace . It is proposed to have approximately half day requirement storage in the domestic and flushing water storage chamber. In addition, there would be static storage for firefighting purposes also, as per national Building Code.

Sewer System

The soil and from toilets and kitchen will be collected in single network of sewer pipes running under the basement celling . It is proposed to install sewage treatment plant on the site for treatment of sewage.

Drain

The terrace and balconies of the buildings are proposed to be drained by means of down take pipes while open areas and roads would be drained into drains. These drains are proposed to be aligned along the roads within the Complex as per the landscape design The down take pipes from terraces and balconies would discharge into or over an inlet to the surface drains of the Complex. The drains shall be finally discharged into the municipal drainage system after passing through rain water harvesting and ground water recharging structures.

Parks

Landscaping of the parks with plantation including trees shrubs and ground covers and recreational benches and walkway proposed landscape area in the project is 4320 sqmt.

Tree Planting

As per landscape drawing.

Design For Electric Supply Including Street Lighting

The building shall be suppled power by the State Electricity Board. Since the source is unstable due to frequent brown out /black out , it is proposed that full DG power backup shall be provided to all the common services and apartments. .Some critical load such as a emergency lighting, headed equipment of ELV system etc., shall be additionally backed up using UPS (Battery backup) system. The electrical power requirement for the project has been estimated based on (at the rate) 50 watt/sq. mtr of FAR area of the apartment.(as per UP electricity authority). Lighting for streets car park area , landscape areas, walkways (both covered and uncovered) shall be controlled by static timer for energy saving. LED shall be used to in all common area and external lighting yo reduce power consumption.

Community Buildings

Club house as per plan having Multi purpose Hall, Gym, Gaming zone, cafeteria, spa/salon, senior lounge etc,

Treatment and Disposal System of Sewage and Sullage water

It is proposed to install sewage treatment plant on the site for treatment of sewage. The quantity of recycle water required in flushing, horticulture shall be treatment up to tertiary level and the balance waste shall be discharged into municipal drainage system after treatment. total capacity of sewage Treatment plant =100 KLD

Solid Waste Management And Disposal System

Segregation of soild waste

Water Conservation System

a. The operation of pumps will be based on level sensors to ensure that water is not wasted and to avoid unnecessary operation of the equipment. b. Pumps and equipment will be selected on "best" energy efficiency point. c. water Conservation will be provided using low flow fixtures / flow restrictors. d. Dual-flushing cisterns will reduce water consumption. The tower consumption in dual flush will be (at the rate)maximum 3 liters for low flush and (at the rate)6 liters for high flush. e. Sensor based urinals will be install to ensure flushing only when in use to reduce the water consumption. f. provision of sewage treatment plant is proposed to treat 100 percent waste water generated. g. Recycle of treated effluent will reduce the total net fresh water demand of the project. Thereby reducing the load and dependency on municipal supply. h. Irrigation system management will be provided by providing latest irrigation systems i.e. sprinkler system, time based controller , water metering etc. to reduce the water consumption in horticulture. i. rain water harvesting and ground water recharging for roof and non-roof areas is provided. The total volumetric capacity of recharge structures shall be as required by the regulations. j. Water metering will be provided for landscape water consumption, treated waste consumption , swimming pool and water fountain consumption and bot water consumption through system.

Energy Management System Including Use of Renewable Energy

a. ALL lifts shall be provided with AC variable voltage, variable frequency drives (ACVVF). b. Power factor shall be maintained 0.90 to unity. c. timer shall be used switch on / off parking lights during non- peak hours for power conservation . d. LED shall be used to in all common area and external lighting to reduce power consumption. e. Controller based synchronization along with PLC based load management is proposed to reduce the oil consumption and effective utilization of DG Sets. f. All DG Sets will be CPCB certified for noise and emissions. g. The exhaust pipes of DG Sets will be taken up as per CPCB guide lines. h. lighting power density ( LPD) values of all common areas and external / street lighting will be maintained at or below ECBC value by providing energy efficient light fixtures and LED s. The lux levels will be provided as per NCB. I. Metering will be install on all sub feeders related to common services viz. Water supply Pumps, Firefighting pumps, Sewage treatment plant, Elevators, Ventilation, External area lighting etc. j. Pump should be BEE 4-star rated or minimum 7percent efficiency for pumps of capacity greater than 3 HP and ISI certified pumps for other and motor should be BEE4-star rated or minimum 85 percent efficiency for motors of capacity greater than 3HP and ISI certified motors for others. k. Low loss transformers will Provided as per latest Is 1180 (2014) Part-1 (latest ammendment with energy efficiency level -1 . I. The exit signage power consumption shall be less than 5 watt/face

Fire Protection And Fire Safety System

The entire mix land use project has been divided in to tow zones depending upon its usages and category , Zone I- One or tow family private dwellings residential building less than 15m in height Zone-II - Club house Assembly building Above than 10m But not exceeding 15 m in height . the entire fire safety installation shall be compliant with the most stringent codes standard for the entire Township to ensure the highest safety standard and uniformity of system Refer NB C- 2016 attachement for reference. interanal and external fire hydrant system shall be provided with landing valve, hose reel with shut off nozzle, short branch pipe With nozzle and fire mans axe. Automatic Sprinkler system is provided The system shall be suitably zoned for its Optimum requiremests In oreder to detect the fire/smoke in incipient stages an intelligent/ Addressable automatic fire detection alarm system is proposed to be provided to cover all areas to provide timely waring to accupants to evacuate safely before the fire/ smoke spreads. The system shall be fully zoned addressable digital self diagnostic and cover all internal and external areas.

Social Infrastructure And Other Public Amenities Including Public Health Services

Club swimming pool etc.

Emergency Evacuation Services

Fire starecase to be provided as per sanction plan

Other Miscellaneous Work

Not Availble

New Documents

Registry Document

No: 9467 | Date: 11-10-2013

Registry Document

No: Merger Order of Sunglow with Jainco | Date: 12-01-2021

Registry Document

No: MDA Mutation Certificate in the name of JAINCO | Date: 18-03-2023

Lease Deed

No: 3630 | Date: 01-08-2006

Registry Document

No: PMAY UP New Policy 2018 | Date: 12-07-2018

Registry Document

No: 449 | Date: 09-10-2023

Uploaded Documents

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Other

Details of Encumbrances

Uploaded: 03-08-2023

Commencement Certificate

Uploaded: 03-08-2023

Other Plan(If Any)

Uploaded: 03-08-2023

Proforma of Application Form

Uploaded: 03-08-2023

Proforma of Allotment Letter

Uploaded: 03-08-2023

Proforma of Conveyance Deed

Uploaded: 18-08-2023

Waste Disposal Plan

Uploaded: 03-08-2023

Water Supply Plan

Uploaded: 18-08-2023

Electricity Supply Plan

Uploaded: 03-08-2023

Development Work Plan

Uploaded: 03-08-2023

Affidavit

Uploaded: 03-08-2023

CA CERTIFICATE

Uploaded: 03-08-2023

ARCHITECT CERTIFICATE

Uploaded: 03-08-2023

ENGINEERS CERTIFICATE

Uploaded: 03-08-2023

Permits

Orignal Permit NoGroup Housing/01999/MBDA/22-23/0414/08052023
Orignal Permit Date23-06-2023
Valid Upto22-06-2028
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto22-06-2031
End Date31-08-2027
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra Detail-

Project Team

Contractor Name (if any)Gulshan Homz Private Limite
Contractor AddressPlot No-2C, GC Grand, Vaibhav khand Indirapuram, Ghaziabad Uttar Pradesh, 201014
Architect NameVishal sharma
Architect AddressB-421, New Friends Colony, New Delhi - 110065
Architect Licence NumberCA/98/23261
Structural Engineer NameDr. Gyan Singh
Structural Engineer AddressT17, Aditya city Centre, 3rd Floor, Vaibahv khand, Indirapuram Ghaziabad (UP) - 201014
Mobile number(Project Co-ordinator)7669027898

Project Land Details

AFS

Showing 46 blocks with 58 units

Property Summary

Total Area

55433.97

596685.71 ft²

Total Units

103

2 different types

Blocks & Floors

46

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:538.19
Balconies:180
Parking ratio:0.00 per unit

Block COMMERCIAL BLOCK

13 units

Block BLOCK AB - 1

1 units

Block BLOCK AB - 2

1 units

Block BLOCK AB - 3

1 units

Block BLOCK AB - 4

1 units

Block BLOCK AB - 5

1 units

Block BLOCK AB - 6

1 units

Block BLOCK AB - 7

1 units

Block BLOCK AB - 8

1 units

Block BLOCK AB - 9

1 units

Block BLOCK AB - 10

1 units

Block BLOCK AB - 11

1 units

Block BLOCK AB - 12

1 units

Block BLOCK AB - 13

1 units

Block BLOCK AB - 14

1 units

Block BLOCK AB - 15

1 units

Block BLOCK AB - 16

1 units

Block BLOCK AB - 17

1 units

Block BLOCK AB - 18

1 units

Block BLOCK AB - 19

1 units

Block BLOCK AB - 20

1 units

Block BLOCK AB - 21

1 units

Block BLOCK AB - 22

1 units

Block BLOCK AB - 23

1 units

Block BLOCK AB - 24

1 units

Block BLOCK AB - 25

1 units

Block BLOCK AB - 26

1 units

Block BLOCK AB - 27

1 units

Block BLOCK AB - 28

1 units

Block BLOCK AB - 29

1 units

Block BLOCK AB - 30

1 units

Block BLOCK AB - 31

1 units

Block BLOCK AB - 32

1 units

Block BLOCK AB - 33

1 units

Block BLOCK AB - 35

1 units

Block BLOCK AB - 36

1 units

Block BLOCK AB - 37

1 units

Block BLOCK AB - 38

1 units

Block BLOCK AB - 39

1 units

Block BLOCK AB - 40

1 units

Block BLOCK AB - 34

1 units

Block BLOCK AB - 41

1 units

Block BLOCK AB - 42

1 units

Block BLOCK AB - 43

1 units

Block BLOCK AB - 44

1 units

Block BLOCK AB - 45

1 units

Khasra Details

Total Area

55085.00

592929.43 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:GH-10, Sector 04, New Moradabad
Area(In Sq. Mt.):55085

Other Details

Contractor Name (if any):Gulshan Homz Private Limite
Contractor Address:Plot No-2C, GC Grand, Vaibhav khand Indirapuram, Ghaziabad Uttar Pradesh, 201014
Architect Name:Vishal sharma
Architect Address:B-421, New Friends Colony, New Delhi - 110065
Architect Licence Number:CA/98/23261
Structural Engineer Name:Dr. Gyan Singh
Structural Engineer Address:T17, Aditya city Centre, 3rd Floor, Vaibahv khand, Indirapuram Ghaziabad (UP) - 201014
Mobile number(Project Co-ordinator):7669027898