NewActive

GULSHAN DYNASTY

Gautam Buddha Nagar, Uttar Pradesh
25-11-2019
Launch Date
New
Type
29-03-2025
Completion Date

Overview

Project Area

5.8080 acres

Launch Date

Invalid Date

Completion Date

29-03-2025

RERA ID

UPRERAPRJ950870

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)23504
Project NameGULSHAN DYNASTY
Registration Fee (in Rs.)123000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)65
DistrictGautam Buddha Nagar
Original Start Date-
TehsilGautam Buddha Nagar
Proposed Start Date25-11-2019
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)56800
Proposed Completion Date29-03-2025

Location

Latitude

282950.06

Longitude

772618.03

Bank Details

Account no.777705160197
Name Of Account HolderGULSHAN HOMZ PRIVATE LIMITED
Bank NameICICI BANK LIMITED
Branch Address132, HARGOBIND ENCLAVE, DELHI-110092
Branch NameHARGOBIND ENCLAVE
IFSC CodeICIC0006628

Development Works

Demarcation of Plots

YES

Boundary Wall

A Combination of R.C.C / Brick wall with finishing work

Road Work

Fire Tender paths and other area Hard-escape as per Norms.

Footpaths

TO BE PROVIDED AS PER SANCTIONED

Water Supply Including Drinking Water Facilities

Shall be provided by Noida Authority and Internal water supply network including UG tank shall be constructed by promoters, details planed enclosed.

Sewer System

Sewer line with required slope and adequate catch basins and manholes and STP detailed plan/Single line plan enclosed.

Drain

Adequate catch basins and manholes, Internal drain shall be constructed by promoters and shall be connected to noida authority drain.

Parks

Green area to be provided as per sanction plan, all the amenities and plants proposed in the park as per drawing approved by Noida authority shall be developed.

Tree Planting

As per norms set by state government.

Design For Electric Supply Including Street Lighting

site is covered by uppcl/npcl Electric supply network and the connection as per requirement shall be taken by promoters. Internal electrical network in the towers and common areas shall be constructed by promoters.

Community Buildings

YES

Treatment and Disposal System of Sewage and Sullage water

To be provided as per norms

Solid Waste Management And Disposal System

To be provided as per authority norms

Water Conservation System

Rain water harvesting pits are provided as per norms

Energy Management System Including Use of Renewable Energy

Solar light system shall be developed as per norms of state government.

Fire Protection And Fire Safety System

Fire sprinklers, Smoke detectors, FHC are provided as per norms

Social Infrastructure And Other Public Amenities Including Public Health Services

As per Norms , if applicable

Emergency Evacuation Services

As per norms if applicable

Other Miscellaneous Work

As per layout and requirements

Documents

Lease Deed

No: 7362 BOOK NO.1 VOL NO.2354 PAGE NO.361 TO 396 | Date: 21-03-2016

Other Plan(If Any)

Other Plan(If Any)

Other Plan(If Any)

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 06-11-2019

Commencement Certificate

Uploaded: 15-10-2019

Other Plan(If Any)

Uploaded: 02-11-2019

Proforma of Application Form

Uploaded: 15-10-2019

Proforma of Allotment Letter

Uploaded: 15-10-2019

Proforma of Conveyance Deed

Uploaded: 15-10-2019

Waste Disposal Plan

Uploaded: 15-10-2019

Water Supply Plan

Uploaded: 15-10-2019

Electricity Supply Plan

Uploaded: 15-10-2019

Development Work Plan

Uploaded: 15-10-2019

Affidavit

Uploaded: 06-11-2019

CA CERTIFICATE

Uploaded: 16-10-2019

ARCHITECT CERTIFICATE

Uploaded: 15-10-2019

ENGINEERS CERTIFICATE

Uploaded: 15-10-2019

Permits

Orignal Permit NoNOIDA/CAP/2019/III-299/1151
Orignal Permit Date01-10-2019
Valid Upto30-09-2024
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto30-09-2027
End Date30-11-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit No-
Orignal Permit Date01-01-1900
Valid Upto30-09-2024
Revalidated Permit NoNOIDA/CAP/2019/III-299/1151
Revalidated Permit Date01-10-2019
Revalidated Permit Valid Upto30-09-2024
Permit Extendable Upto30-09-2027
End Date30-09-2024
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)GULSHAN HOMZ PRIVATE LIMITED
Contractor Address121,HARGOVIND ENCLAVE, DELHI 110092
Architect NameVISHAL SHARMA
Architect AddressB-421,NEW FRIENDS COLONY, NEW DELHI -110065
Architect Licence NumberCA-98/23261
Structural Engineer NameV.D. SHARMA
Structural Engineer AddressB-24, Sector - 67 , NOIDA
Mobile number(Project Co-ordinator)9582255184

Land Details

AFS

Showing 4 blocks with 109 units

Property Summary

Total Carpet Area

54647.10

588215.92 ft²

Total Units

213

4 different types

Blocks & Floors

4

36 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:256.56
Balconies:528
Parking ratio:0.00 per unit

Block A

36 units

Block B

36 units

Block C

36 units

Block Commercial

1 units

Khasra Details

Total Area

23504.50

253000.09 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH03D,SECTOR-144,NOIDA
Area(In Sq. Mt.)23504.50

Other Details

Contractor Name (if any)GULSHAN HOMZ PRIVATE LIMITED
Contractor Address121,HARGOVIND ENCLAVE, DELHI 110092
Architect NameVISHAL SHARMA
Architect AddressB-421,NEW FRIENDS COLONY, NEW DELHI -110065
Architect Licence NumberCA-98/23261
Structural Engineer NameV.D. SHARMA
Structural Engineer AddressB-24, Sector - 67 , NOIDA
Mobile number(Project Co-ordinator)9582255184