283630
77270
Yes
RCC Column, Plinth beam and Brick work with Finishing
Yes
Brick tow wall and PCC with top finishes
GI/PVC line for cold water and cPVC for internal concealed pipe line
PVC/CI inside building and RCC hume pipe line for external with manholes.
PVC/CI inside building and RCC hume pipe line for external with manholes.
As per submission plans.. Green area with plantation
As per Submission plans
LED street lights as per drawings
As per plan with party hall, indoor games other amenties.
STP with required capacity as per SEAC norms
Organic Waste Composter as per SEAC norms.
Rain water harvesting pit as EC conditions.
LT panel room with duel source energy supply
As per fire approval as NBC
Amphetheter, children play areas etc.
NA
Gated/Controlled entry and exsess
Showing 13 blocks with 178 units
Total Area
81100.05 m²
872952.83 ft²
Total Units
1167
3 different types
Blocks & Floors
13
20 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
28374.22 m²
305417.27 ft²