28.462911
77.532096
AS PER APPROVED BUILDING PLAN
AS PER APPROVED BUILDING PLAN
AS PER APPROVED BUILDING PLAN
AS PER APPROVED BUILDING PLAN
THE DEVELOPERS SHALL NOT USE THE WATER IN CONSTRUCTION OF THE PIROJECT. INSTEAD STP TRETED WATER SHALL WE USED FOR CONSTRUCTION.
CENTRALISED STP TO TREAT THE SEWEAGE
CENTRALISED STP TO TREAT THE SEWEAGE
AS PER APPROVED BUILDING PLAN
AS PER APPROVED BUILDING PLAN
SINGLE FEEDER SHALL BE TAKEN FROM GREATER NOIDA ELECTRICITY BOARD AND CONNECTED TO CENTRAL SUB
NOT APPLICABLE
CENTRAL STP FOR ENTIRE PROJECT
PROJECT SHALL HAVE WASTE SEGREGATION AREA AND OWC FOR TREATMENT
ADEQUATE NO. OF RECHARGE PITS MADE
LED LIGHTS AND TIMER CONTROL PANELS SHALL BE USED FOR EFFICIENT ENERGY MANAGEMENT
FIRE ALARM SYSTEM PROVIDED
NOT APPLICABLE
AS PER APPROVED BUILDING PLAN
AS PER APPROVED BUILDING PLAN
Showing 1 blocks with 982 units
Total Area
47702.64 m²
513466.45 ft²
Total Units
1009
2 different types
Blocks & Floors
1
38 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
91308.00 m²
982830.18 ft²