Project Area
Launch Date
Completion Date
RERA ID
26 45 21.3
80 57 09.2
Possession & physical demarcation of plot done by Awas Vikas
7 feet height boundary wall by brick work except frontal portion
RCC Internal road network
Internal Footpaths paver lined
Uninterrupted water supply through overhead & underground tanks
Sewer network by PVC & RCC humes pipes
RCC drain network & collection of strom water through KC drains
Development of parks with designer landscape with swings etc.
Along the periphery of boundary wall
15% of consumption based on renewal energy & rest of demand supply through state electricity boards
Club Building at stilt floor
STP to be installed with in site and treated sewer shall be disposed off in trunk sewer of Awas Vikas
Segregation at site and efficient disposal of solid waste
Rain water recharge pits to be installed at site for water balance
Solar energy shall be used as renewable energy
As per provisional NOC taken from Fire department
Common toilet blocks at stilt floor for visitors
Through fire stair cases
Use of environment friendly building materials in constructions
Showing 1 blocks with 57 units
Total Carpet Area
19347.62 m²
208255.85 ft²
Total Units
240
2 different types
Blocks & Floors
1
14 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
5717.00 m²
61537.22 ft²