Godrej Woods Phase II

Gautam Buddha Nagar, Uttar Pradesh
28-01-2027Completion
NewType
Gautam Buddha NagarDistrict
22807 LCost

Basic Details

Project Type:New
Project Category:Mixed
Total area in round figure (Sq.mt.):20602
Project Name:Godrej Woods Phase II
Registration Fee (in Rs.):162750
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):72
District:Gautam Buddha Nagar
Original Start Date:-
Tehsil:Gautam Buddha Nagar
Proposed Start Date:10-02-2021
Sanctioning Competent Authority:Noida Authority
Project Cost (in Lacs):22807
Proposed Completion Date:28-01-2027

Location

Latitude

71.210076

Longitude

28.332727

Bank Details

Account no.:50200055769794
Name Of Account Holder:Roseberry Separate AC Godrej Woods II
Bank Name:HDFC
Branch Address:Ansals Fortune Arcade, K Block, Sector 18, Noida
Branch Name:HDFC Bank
IFSC Code:HDFC0000088

Development Works

Demarcation of Plots

NA

Boundary Wall

1.5m high boundary wall along front road and 2.0m high boundary wall along other sides with Elegant Design integrated with security rails as per approved design

Road Work

Peripheral Loop road connects to each tower as per approved building plan

Footpaths

Network of Footpaths connects the various part of the Landscape, Towers and Gardens as per approved building plan

Water Supply Including Drinking Water Facilities

Noida Authority shall provide the water supply to the entire society, further water will be treated and supplied at customer premises through piping, and pumping / gravity system.

Sewer System

Centralized STP to treat sewage and every tower has its own downcomers connected to main sewage line.

Drain

Drainage thru network of pipe and catch basin to nearest Storm Water Drain / Rain Water Harvesting Pit.

Parks

As per approved Building Plan

Tree Planting

As per approved Building Plan

Design For Electric Supply Including Street Lighting

Single feeder shall be taken from Noida Electricity Board and connected to Sub-Station. Entire Project would have street lighting.

Community Buildings

Community Building as per approved Building Plan

Treatment and Disposal System of Sewage and Sullage water

Central STP for entire Project and all towers shall be connected to STP

Solid Waste Management And Disposal System

Project shall have waste segregation area and OWC for treatment of organic waste

Water Conservation System

Adequate nos. of Recharge Pits shall be provided.

Energy Management System Including Use of Renewable Energy

LED Lights and timer control panel shall be used for efficient energy management.

Fire Protection And Fire Safety System

Fire Alarm System provided for towers with height above 60m.

Social Infrastructure And Other Public Amenities Including Public Health Services

As per Approved Building Plan

Emergency Evacuation Services

As per approved Building Plan

Other Miscellaneous Work

As per approved Building Plan

New Documents

Lease Deed

No: 345 | Date: 19-01-2018

Allotment Letter issued by Competent Authority

No: NOIDA/Commercial/2016/1930 | Date: 26-08-2016

Uploaded Documents

Details of Encumbrances

Proforma of Application Form

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Development Work Plan

CA CERTIFICATE

ARCHITECT CERTIFICATE

Details of Encumbrances

Uploaded: 28-04-2021

Commencement Certificate

Uploaded: 26-04-2021

Other Plan(If Any)

Uploaded: 19-03-2021

Proforma of Application Form

Uploaded: 10-04-2021

Proforma of Allotment Letter

Uploaded: 10-04-2021

Waste Disposal Plan

Uploaded: 11-03-2021

Water Supply Plan

Uploaded: 11-03-2021

Electricity Supply Plan

Uploaded: 11-03-2021

Development Work Plan

Uploaded: 11-03-2021

Affidavit

Uploaded: 19-03-2021

CA CERTIFICATE

Uploaded: 26-04-2021

ARCHITECT CERTIFICATE

Uploaded: 26-04-2021

ENGINEERS CERTIFICATE

Uploaded: 26-04-2021

Permits

Orignal Permit NoNOIDA/MU.VA.NI/III-305/2021/1181
Orignal Permit Date08-01-2021
Valid Upto07-01-2026
Permit Extendable Upto06-01-2031
End Date28-01-2027

Project Team

Contractor Name (if any)Arun Verma and Vishal Gupta
Contractor AddressS.S. Construction Co. and Jai Jai Ram Singh Infrastructure Pvt. Ltd SCO-375, SECTOR-37D, CHANDIGARH and DCG4-1516, DLF Corporate Green, T04, Sector-74A, Gurgaon
Architect NameAr. Abhishek Verma
Architect AddressFlat No. 1314, Tower-F, Ashiana Le Residency, Landcraft Golflinks, Ghaziabad-201002
Architect Licence NumberCA/2004/33902
Structural Engineer NameAmol Acharya
Structural Engineer AddressWalter P Moore Engineering India Pvt. Ltd. Office No. 5B, 5th Floor, S.No. 8+23/1/2, Erandwane, Pune, Maharashtra-411004
Mobile number(Project Co-ordinator)8800010790

Project Land Details

AFS

Showing 6 blocks with 307 units

Property Summary

Total Area

44663.66

480755.17 ft²

Total Units

571

5 different types

Blocks & Floors

6

28 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:78.22
Balconies:885
Parking ratio:0.00 per unit

Block Cyprus (Tower-4)

56 units

Block Alba (Tower-6)

56 units

Block Robusta (Tower-5)

56 units

Block Verbena (Tower-7)

56 units

Block Fern (Tower-8)

55 units

Block Commercial

28 units

Khasra Details

Total Area

44310.00

476948.41 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:GH 01A
Area(In Sq. Mt.):44310

Other Details

Contractor Name (if any):Arun Verma and Vishal Gupta
Contractor Address:S.S. Construction Co. and Jai Jai Ram Singh Infrastructure Pvt. Ltd SCO-375, SECTOR-37D, CHANDIGARH and DCG4-1516, DLF Corporate Green, T04, Sector-74A, Gurgaon
Architect Name:Ar. Abhishek Verma
Architect Address:Flat No. 1314, Tower-F, Ashiana Le Residency, Landcraft Golflinks, Ghaziabad-201002
Architect Licence Number:CA/2004/33902
Structural Engineer Name:Amol Acharya
Structural Engineer Address:Walter P Moore Engineering India Pvt. Ltd. Office No. 5B, 5th Floor, S.No. 8+23/1/2, Erandwane, Pune, Maharashtra-411004
Mobile number(Project Co-ordinator):8800010790