NewActive

Godrej Woods Phase-1

Gautam Buddha Nagar, Uttar Pradesh
14-07-2026Completion
NewType
Gautam Buddha NagarDistrict
20366 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):16055
Project Name:Godrej Woods Phase-1
Registration Fee (in Rs.):85500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):67
District:Gautam Buddha Nagar
Original Start Date:-
Tehsil:Gautam Buddha Nagar
Proposed Start Date:09-01-2021
Sanctioning Competent Authority:Noida Authority
Project Cost (in Lacs):20366
Proposed Completion Date:14-07-2026

Location

Latitude

77.210076

Longitude

28.332727

Bank Details

Account no.:50200047826844
Name Of Account Holder:ROSEBERRY SEPARATE A-C GODREJ WOODS-I
Bank Name:HDFC BANK
Branch Address:SECTOR 18, NOIDA, 201301
Branch Name:K BLOCK
IFSC Code:HDFC0000088

Development Works

Demarcation of Plots

NA

Boundary Wall

1.5m high Boundary Wall along Main Road and 2.0m high boundary wall on other 3 sides with Elegant Design Integrated with Security Rails and pattern as per approved Building Plan

Road Work

Peripheral loop of road connecting to each tower as per Approval Building Plan

Footpaths

As per Approved Building Plan

Water Supply Including Drinking Water Facilities

Noida Authority shall provide Water Supply to the entire society, further water will be treated and supplied at Customer Premise through piping and pumping/gravity system.

Sewer System

Centralized STP to treat Sewage and every tower has its own down-comers connected to main sewage line.

Drain

Drainage thru network of Pipe and Catch Basin to nearest Storm Water Drain

Parks

As per Approved Building Plan

Tree Planting

As per Approved Building Plan

Design For Electric Supply Including Street Lighting

Single feeder shall be taken from Noida Electricity Board and connected to Central Sub-Station. Entire Project would have Street Lighting

Community Buildings

Community Building as per Approved Building Plan (Part of Phase-2 of the Project)

Treatment and Disposal System of Sewage and Sullage water

Central STP for entire Project and all towers shall be connected to STP.

Solid Waste Management And Disposal System

Project shall have waste segregation area and OWC for treatment of organic waste.

Water Conservation System

Adequate nos. of Recharge Puts shall be made.

Energy Management System Including Use of Renewable Energy

LED Lights and timer control panel shall be used for efficient energy management.

Fire Protection And Fire Safety System

Fire alarm system provided for towers with height above 60m

Social Infrastructure And Other Public Amenities Including Public Health Services

As per Approved Building Plan

Emergency Evacuation Services

As per Approved Building Plan

Other Miscellaneous Work

As per Approved Building Plan

New Documents

Lease Deed

No: 345 | Date: 19-01-2018

Uploaded Documents

Details of Encumbrances

Other Plan(If Any)

Proforma of Application Form

Proforma of Allotment Letter

Proforma of Allotment Letter

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Waste Disposal Plan

Water Supply Plan

Electricity Supply Plan

Development Work Plan

Affidavit

CA CERTIFICATE

ENGINEERS CERTIFICATE

Details of Encumbrances

Uploaded: 14-02-2021

Commencement Certificate

Uploaded: 16-01-2021

Other Plan(If Any)

Uploaded: 15-02-2021

Proforma of Application Form

Uploaded: 14-02-2021

Proforma of Allotment Letter

Uploaded: 15-02-2021

Proforma of Conveyance Deed

Uploaded: 14-02-2021

Waste Disposal Plan

Uploaded: 15-02-2021

Water Supply Plan

Uploaded: 15-02-2021

Electricity Supply Plan

Uploaded: 15-02-2021

Development Work Plan

Uploaded: 14-02-2021

Affidavit

Uploaded: 14-02-2021

CA CERTIFICATE

Uploaded: 14-02-2021

ARCHITECT CERTIFICATE

Uploaded: 18-01-2021

ENGINEERS CERTIFICATE

Uploaded: 12-02-2021

Permits

Orignal Permit NoNOIDA/MU.VA.NI/III-305/2021/1181
Orignal Permit Date08-01-2021
Valid Upto07-01-2026
Permit Extendable Upto06-01-2031
End Date14-07-2026

Project Team

Contractor Name (if any)NA
Contractor AddressNA
Architect NameAbhishek Verma
Architect AddressFlat No. 1314, Tower-F, Ashiana Le Residency, Landcraft Golflinks, Ghaziabad-201301
Architect Licence NumberCA/2004/33902
Structural Engineer NameWalter P Moore Engineering India Pvt. Ltd.
Structural Engineer AddressOffice No. 5B, 5th Floor, S.No. 8+23/1/2, Erandwane, Pune, Maharashtra 411004
Mobile number(Project Co-ordinator)8800010790

Project Land Details

AFS

Showing 3 blocks with 117 units

Property Summary

Total Area

40400.99

434872.22 ft²

Total Units

430

3 different types

Blocks & Floors

3

28 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:93.96
Balconies:309
Parking ratio:0.00 per unit

Block Indica (Tower-1)

29 units

Block Cassia (Tower-2)

57 units

Block Rosea (Tower-3)

31 units

Khasra Details

Total Area

44310.00

476948.41 ft²

1 plot
Plot
Type:Plot
Khasra/Plot No:GH 01 A
Area(In Sq. Mt.):44310

Other Details

Contractor Name (if any):NA
Contractor Address:NA
Architect Name:Abhishek Verma
Architect Address:Flat No. 1314, Tower-F, Ashiana Le Residency, Landcraft Golflinks, Ghaziabad-201301
Architect Licence Number:CA/2004/33902
Structural Engineer Name:Walter P Moore Engineering India Pvt. Ltd.
Structural Engineer Address:Office No. 5B, 5th Floor, S.No. 8+23/1/2, Erandwane, Pune, Maharashtra 411004
Mobile number(Project Co-ordinator):8800010790