77.210076
28.332727
NA
1.5m high Boundary Wall along Main Road and 2.0m high boundary wall on other 3 sides with Elegant Design Integrated with Security Rails and pattern as per approved Building Plan
Peripheral loop of road connecting to each tower as per Approval Building Plan
As per Approved Building Plan
Noida Authority shall provide Water Supply to the entire society, further water will be treated and supplied at Customer Premise through piping and pumping/gravity system.
Centralized STP to treat Sewage and every tower has its own down-comers connected to main sewage line.
Drainage thru network of Pipe and Catch Basin to nearest Storm Water Drain
As per Approved Building Plan
As per Approved Building Plan
Single feeder shall be taken from Noida Electricity Board and connected to Central Sub-Station. Entire Project would have Street Lighting
Community Building as per Approved Building Plan (Part of Phase-2 of the Project)
Central STP for entire Project and all towers shall be connected to STP.
Project shall have waste segregation area and OWC for treatment of organic waste.
Adequate nos. of Recharge Puts shall be made.
LED Lights and timer control panel shall be used for efficient energy management.
Fire alarm system provided for towers with height above 60m
As per Approved Building Plan
As per Approved Building Plan
As per Approved Building Plan
Showing 3 blocks with 117 units
Total Area
40400.99 m²
434872.22 ft²
Total Units
430
3 different types
Blocks & Floors
3
28 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
44310.00 m²
476948.41 ft²