OngoingActive

GNB PHASE-1 (THE GREAT NORTHERN BAZAAR)

Ghaziabad, Uttar Pradesh
01-02-2013
Launch Date
Ongoing
Type
31-12-2018
Completion Date

Overview

Project Area

2.8214 acres

Launch Date

01-02-2013

Completion Date

31-12-2018

RERA ID

UPRERAPRJ6108

Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)11418
Project NameGNB PHASE-1 (THE GREAT NORTHERN BAZAAR)
Registration Fee (in Rs.)125000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)71
DistrictGhaziabad
Original Start Date01-02-2013
TehsilModinagar
Proposed Start Date01-02-2013
Sanctioning Competent AuthorityGhaziabad Development Authority
Project Cost (in Lacs)5100
Proposed Completion Date31-12-2018

Location

Latitude

28 42' 15.81' N

Longitude

77 24' 57.60'E

Bank Details

Account no.911020021996024
Name Of Account HolderMR PROVIEW REALTECH PVT. LTD.
Bank NameAXIS BANK LTD.
Branch Address3, N-30, AMBEDKAR NAGAR, NEHRU NAGAR, GHAZIABAD
Branch NameNEHRU NAGAR, GHAZIABAD
IFSC CodeUTIB0000095

Development Works

Demarcation of Plots

Private- Free Hold Land, Demarkation was allready done before starting the project

Boundary Wall

Boundry wall on RCC Tie, Beam on RCC Footing

Road Work

Cements Concrete Internal Roads( CC Roads above to Layers of WBM

Footpaths

Interlocking Tile, Pavers, on PCC on compected surface

Water Supply Including Drinking Water Facilities

to Be provided by Ghaziabad Development Athority and stores will be doned underground water tanks

Sewer System

Main Sewer line has been desingn as per norm ands partally led in basment ciling and will finaly conect to sawer line/ STP

Drain

Under ground Drain pipe with chaber

Parks

Land scape and park has been designed as per athority guide lines

Tree Planting

Tree panting has been design as per Athoruty Guide lines

Design For Electric Supply Including Street Lighting

Design has been done as per Up electricity Board Guide lines

Community Buildings

N/A

Treatment and Disposal System of Sewage and Sullage water

Sewage will be treted for recycline ( if required ) other wise it wiil be connected to sewar line of Authority which is allready connected to central functional STP of GDA For this locality.

Solid Waste Management And Disposal System

Door to Door Collection and will be treated by waste disposal management.

Water Conservation System

Recycling of Treated water and rain water harvesting system to be provided.

Energy Management System Including Use of Renewable Energy

Solar panel will be provided as per norms as sutaible Places

Fire Protection And Fire Safety System

Fire System is being executed per the norm of department of fire.

Social Infrastructure And Other Public Amenities Including Public Health Services

Kids Play Area and First Aid Facility to be provided.

Emergency Evacuation Services

Provision of exit sign and emengency light.

Other Miscellaneous Work

N/A

Documents

Details of Encumbrances

Other Plan(If Any)

Proforma of Application Form

Uploaded: 31-07-2018

Proforma of Allotment Letter

Uploaded: 31-07-2018

Waste Disposal Plan

Uploaded: 31-07-2018

Water Supply Plan

Uploaded: 31-07-2018

Development Work Plan

Uploaded: 31-07-2018

CA CERTIFICATE

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 29-07-2018

Affidavit

Uploaded: 30-07-2017

Affidavit

Uploaded: 30-07-2017

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 12-10-2017

Registry Document In Case of Own Land

Uploaded: 12-10-2017

Other Plan(If Any)

Uploaded: 12-10-2017

Permits

Orignal Permit No880/GMP/MULTIPLEX/11-12
Orignal Permit Date19-11-2012
Valid Upto18-11-2017
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto18-11-2020
End Date31-12-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)N/A
Contractor AddressN/A
Architect NameANUJ AGARWAL
Architect AddressA-244, KAUSHAMBI, GHAZIABAD
Architect Licence NumberCA/96/19503
Structural Engineer NameSADANAND OJHA
Structural Engineer Address503, Sachdeva Corporate Tower, Plot No-8, Sector-8, Rohini, Delhi
Mobile number(Project Co-ordinator)9999537765

Land Details

AFS

Showing 1 blocks with 55 units

Property Summary

Total Carpet Area

7282.25 m²

78385.41 ft²

Total Units

135

2 different types

Blocks & Floors

1

5 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:53.94 m²
Balconies:0
Parking ratio:0.00 per unit

Block GNB

55 units

Other Details

Contractor Name (if any)N/A
Contractor AddressN/A
Architect NameANUJ AGARWAL
Architect AddressA-244, KAUSHAMBI, GHAZIABAD
Architect Licence NumberCA/96/19503
Structural Engineer NameSADANAND OJHA
Structural Engineer Address503, Sachdeva Corporate Tower, Plot No-8, Sector-8, Rohini, Delhi
Mobile number(Project Co-ordinator)9999537765