28572425
37383271
Demarcation was already done before starting the project
Boundary wall on RCC tie beams supported on RCC footings
Cement concrete internal road complete or remaining work yet to be done
Interlocking pavers on PCC & compacted surface
To be provided by the Noida Authority
Main sewer line has been designed as per norms
Underground pipe drain with chamber
Landscape and parks has been designed by as per authority guideline
Tree Planting has been designed by as per authority guideline
Design has been done as per UP Electrical Board guideline
Club has been designed as per sanctioned drawings
Sewage will be treated for recycling (if required) and reaming dispose to connect authority sewerage system
Collection door to door and will be disposed up to garbage point of Authority
Recycling of treated water and rain water system to be provided by the guidelines of environment department
Solar enable lights to be provided as per norms at suitable place
System will be provided as per rules of fire safety department
NA
Provisions to be provided of Exit Sign & Emergency Lights
NA
Showing 9 blocks with 304 units
Total Area
51268.06 m²
551844.27 ft²
Total Units
660
5 different types
Blocks & Floors
9
20 floors across all blocks
Parking
0
0 garages, 0 open