Garden Bay Iris Villas

Lucknow, Uttar Pradesh
06-03-2024Completion
NewType
LucknowDistrict
1010 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):3266.36
Project Name:Garden Bay Iris Villas
Registration Fee (in Rs.):20500
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):32
District:Lucknow
Original Start Date:-
Tehsil:Lucknow
Proposed Start Date:01-08-2021
Sanctioning Competent Authority:Lucknow Development Authority
Project Cost (in Lacs):1010
Proposed Completion Date:06-03-2024

Location

Latitude

26.920884

Longitude

80.884927

Bank Details

Account no.:687102100000100
Name Of Account Holder:SHALIMAR KSMB PROJECTS- SEPARATE ACCOUNT FOR GARDEN BAY IRIS VILLA
Bank Name:PUNJAB NATIONAL BANK
Branch Address:VIVEK KHAND, GOMTI NAGAR, LUCKNOW
Branch Name:GOMTI NAGAR, LUCKNOW
IFSC Code:PUNB0068710

Development Works

Demarcation of Plots

There are four rectangular shape plots, having total 1 no. of entry gate and 1 no. of exit gate from the 18m wide front road and 9 mtr and 11 mtr internal road, Site is surrounded by other plots on north and west sides.

Boundary Wall

3.0- 3.6 m high and 200 mm thick boundary wall designed. Brick work of 9 inches and RCC work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.

Road Work

Concrete road with bituminous cover/ high quality concrete pavers will be used as per design suggested by the architect for internal road.

Footpaths

All internal roads will have narrow foorpath cement stone pavers or equivalent finishes.

Water Supply Including Drinking Water Facilities

Ground water may also be used. Also end user shall use their individual RO System as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity

Sewer System

Centralized sewerage system shall be provided. All sewerage water shall go to STP for treatment and after treatment water shall be recycled and it will used in gardening, flush tanks and vehicle washing, overflow from STP shall connect with Municiple drain line

Drain

Storm water system shall be provided. Storm water from roads and other landscape area shall be connected to the storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall be connected with Municiple drain Line.

Parks

NA

Tree Planting

There are 5 types of trees provided in site which are kachnar, gulmauhar, amaltas, kusum and neem

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity board and consider centralized transformer, HT Panel, LT Panel, Feeder Pillar and DG Back for common service like external lighting, Pump room etc

Community Buildings

NA (Community building exist in township)

Treatment and Disposal System of Sewage and Sullage water

Centralized sewerage system shall be provided. All sewerage water shall go to STP for treatment and after treatment water shall be recycled and it will use in gardening, flush tanks and vehicle washing, overflow from the STP shall be connected with Municiple Sewerage system.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole complex to conserve water.

Energy Management System Including Use of Renewable Energy

We will use LED Lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 percent of the terrace is covered with solar votaic panels to provide renewable source of energy for common areas in complex.

Fire Protection And Fire Safety System

All the fire norms shall be followed as NBC and approval of fire department.

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage storm water and water supply system shall be provided. We have proposed common pump room with primary filteration, transfer pumps to fill the domestic overhead tank. Water for domestic use and flushing go down through gravity from domestic as well as flushing tanks. All sewage shall go to STP for recycling the water. Storm water for roof, roads and other area shall connect to storm water drain channel and go to the rain water harvesting pit for recharging the ground water and overflow shall connect with Municiple drain.

Emergency Evacuation Services

NA

Other Miscellaneous Work

Luxurious main entrance , angadwadi and convenience store along side of community center for day to day small purchasings, lush green shurbs at every vacant space on ground.

New Documents

Extract of Khatauni

No: 1426-1431 | Date: -

Extract of Khatauni

No: 1426-1431 | Date: -

Extract of Khatauni

No: 1426-1431 | Date: -

Registry Document

No: 410 | Date: 11-08-2014

Registry Document

No: 8609 | Date: 13-09-2006

Registry Document

No: 1853 | Date: 22-02-2007

Registry Document

No: 17728 | Date: 30-11-2013

Registry Document

No: 7646 | Date: 14-08-2007

Extract of Khatauni

No: Approved Layout | Date: -

Uploaded Documents

Details of Encumbrances

Other Plan(If Any)

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

ARCHITECT CERTIFICATE

Details of Encumbrances

Uploaded: 13-07-2021

Commencement Certificate

Uploaded: 22-06-2021

Other Plan(If Any)

Uploaded: 13-07-2021

Proforma of Application Form

Uploaded: 22-06-2021

Proforma of Allotment Letter

Uploaded: 22-06-2021

Proforma of Conveyance Deed

Uploaded: 22-06-2021

Waste Disposal Plan

Uploaded: 22-06-2021

Water Supply Plan

Uploaded: 22-06-2021

Electricity Supply Plan

Uploaded: 22-06-2021

Development Work Plan

Uploaded: 22-06-2021

Affidavit

Uploaded: 23-06-2021

CA CERTIFICATE

Uploaded: 14-07-2021

ARCHITECT CERTIFICATE

Uploaded: 13-07-2021

ENGINEERS CERTIFICATE

Uploaded: 23-06-2021

Permits

Orignal Permit No20180618162722810
Orignal Permit Date07-03-2019
Valid Upto06-03-2024
Permit Extendable Upto06-03-2027
End Date30-05-2023
Orignal Permit NoPlotted Resi development / Plotted Housing/05491/LDA/LD/22-23/0277/27062022
Orignal Permit Date17-08-2022
Valid Upto16-08-2027
Revalidated Permit NoPlotted Resi development / Plotted Housing/05491/LDA/LD/22-23/0277/27062022
Revalidated Permit Date17-08-2022
Revalidated Permit Valid Upto01-01-1900
Permit Extendable Upto16-08-2030
End Date06-03-2024

Project Team

Contractor Name (if any)Mr. Shavez Khan
Contractor Address532/KA/179, Pandey Tola, Aliganj, Lucknow
Architect NameMr. Rudraksha Charan
Architect AddressD-102 Chhatarpur, New delhi-110074
Architect Licence NumberCA/2011/53000
Structural Engineer NameMr. Sanjeev Jain
Structural Engineer AddressI- 1738, Chhittaranjan Park, New Delhi- 110019
Mobile number(Project Co-ordinator)9889820823

Khasra Details

Total Area

3005.00

32345.52 ft²

1 plot
Khasra
Type:Khasra
Khasra/Plot No:192, 212, 214, 215 Village- Ghaila
Area(In Sq. Mt.):3005

Other Details

Contractor Name (if any):Mr. Shavez Khan
Contractor Address:532/KA/179, Pandey Tola, Aliganj, Lucknow
Architect Name:Mr. Rudraksha Charan
Architect Address:D-102 Chhatarpur, New delhi-110074
Architect Licence Number:CA/2011/53000
Structural Engineer Name:Mr. Sanjeev Jain
Structural Engineer Address:I- 1738, Chhittaranjan Park, New Delhi- 110019
Mobile number(Project Co-ordinator):9889820823