Demarkation was already done before starting the project
Boundary wall on RCC tie - Beams supported on RCC footings
Cement Concrete Internal Roads (CC Roads above the two coarse of WBM .
Interlocking Pavers on PCC & compacted surface
To be provided by Greater Noida Industrial Development Authority & Storage will be done in under ground water tank.
Main Sewer line has been designed as per norms and partily laid in basement ceiling and will finally connect to Sewer line / STP
Underground pipe drain with chamber
Landscape and Park has been designed by as per authority guidelines.
Tree Planting has been designed by by as per authority guidelines
Design has been done as per UP Electricity Board Guidelines
Club has been designed as per authority norms
Sewage will be treated for recycling (If required) otherwise, it will be connected to the sewer line of authority
Door to door collection & will be disposed up to garbage point of authority.
Recycling of treated water and rain water system to be provided.
Solar enabled lights has been provided as per norms at suitable place
System will be provided as per the fire department guidelines.
N/A
Provision of Exit Sign & Emergency Lights
N/A
Showing 1 blocks with 75 units
Total Area
15445.50 m²
166253.82 ft²
Total Units
225
2 different types
Blocks & Floors
1
25 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
20000.00 m²
215278.00 ft²