OngoingActive

FOUR STORIED EWS & LIG HOUSES AT ANAND VIHAR SCHEM

Hapur, Uttar Pradesh
27-05-2016
Launch Date
Ongoing
Type
30-09-2017
Completion Date

Overview

Project Area

2.1370 acres

Launch Date

Invalid Date

Completion Date

30-09-2017

RERA ID

UPRERAPRJ7164

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)8648
Project NameFOUR STORIED EWS & LIG HOUSES AT ANAND VIHAR SCHEM
Registration Fee (in Rs.)48500
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)17
DistrictHapur
Original Start Date27-05-2016
TehsilSelect
Proposed Start Date27-05-2016
Sanctioning Competent AuthorityHapur Pilkhuwa Development Authority
Project Cost (in Lacs)1200.00
Proposed Completion Date30-09-2017

Location

Latitude

28 43 13.76

Longitude

77 44 59.79

Bank Details

Account no.86282160000017
Name Of Account HolderHP DEV. AUTHORITY
Bank NameSYNDICATE BANK
Branch AddressPREET VIHAR HAPUR
Branch NameHPDA PREMISES
IFSC CodeSYNB0008628

Development Works

Demarcation of Plots

Well demarcated group housing plots of Anand Vihar Yojna Hapur

Boundary Wall

Boundary is not proposed.

Road Work

External roads are well constructed while internal roads will be of cement concrete.

Footpaths

CC paver blocks will be lay on footpaths.

Water Supply Including Drinking Water Facilities

Water supply will be provided through ground water storage in Over Had Tank.

Sewer System

RCC hume pipes will be laid as a sewer line and connect into trunk sewer line of Anand Vihar Yojna

Drain

Drains are made of RCC and brick work.

Parks

Parks boundary will made with brick work.

Tree Planting

Decorative plants are planned along boundary wall.

Design For Electric Supply Including Street Lighting

Each flat will have independent electric connection.

Community Buildings

Community Building is existing in Anand Vihar Yojna.

Solid Waste Management And Disposal System

Solid waste will be collect door to door by service facilitater and finally disposed through municipal garrabge Van

Water Conservation System

Roof top water harvesting system will be deployed.

Energy Management System Including Use of Renewable Energy

According to requirement.

Fire Protection And Fire Safety System

Six meter wide road is available in the whole pocket for movement fire tender.

Social Infrastructure And Other Public Amenities Including Public Health Services

Social infrastructure is available with in peripheral of 2 km. .

Emergency Evacuation Services

Emergency Evacuation services are available near the project.

Other Miscellaneous Work

As per requirement of project.

Documents

Extract of Khatauni

No: 2008 | Date: -

CA CERTIFICATE

Details of Encumbrances

Uploaded: 21-08-2018

Commencement Certificate

Uploaded: 31-07-2018

Other Plan(If Any)

Uploaded: 31-07-2018

Proforma of Application Form

Uploaded: 31-07-2018

Proforma of Allotment Letter

Uploaded: 31-07-2018

Proforma of Conveyance Deed

Uploaded: 31-07-2018

Proforma of Completion Certificate(Occupancy)

Uploaded: 31-07-2018

Waste Disposal Plan

Uploaded: 21-08-2018

Water Supply Plan

Uploaded: 21-08-2018

Electricity Supply Plan

Uploaded: 21-08-2018

Development Work Plan

Uploaded: 21-08-2018

Affidavit

Uploaded: 31-07-2018

ARCHITECT CERTIFICATE

Uploaded: 31-07-2018

ENGINEERS CERTIFICATE

Uploaded: 31-07-2018

Affidavit

Uploaded: 31-07-2017

Proforma of Application Form

Uploaded: 31-07-2017

Water Supply Plan

Uploaded: 31-07-2017

Proforma of Completion Certificate(Occupancy)

Uploaded: 31-07-2017

Proforma of Allotment Letter

Uploaded: 31-07-2017

Proforma of Conveyance Deed

Uploaded: 31-07-2017

Permits

Orignal Permit NoSELF APPROVED
Orignal Permit Date01-02-2016
Valid Upto31-10-2018
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto31-10-2018
End Date30-09-2017
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)M/S SHIVA & M/S GYANENDRA CONTRACTOR
Contractor AddressPILKHUWA HAPUR
Architect NameANUJ AGARWAL
Architect AddressA-244 KAUSHAMBI GHAZIABAD
Architect Licence NumberCA/96/19503
Structural Engineer NameSADA NAND OJHA
Structural Engineer Address503, SACHDEVA CORPORATE TAWAR PLOT-08 SECTOR-8 ROHNI DELHI
Mobile number(Project Co-ordinator)9761480602

Land Details

AFS

Showing 2 blocks with 8 units

Property Summary

Total Carpet Area

5951.80

64064.58 ft²

Total Units

244

1 different types

Blocks & Floors

2

4 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:24.39
Balconies:244
Parking ratio:0.00 per unit

Block A

4 units

Block EWS Block A,B,C,D,E,F

4 units

Khasra Details

Total Area

8648.00

93086.21 ft²

1 plot
Khasra
TypeKhasra
Khasra/Plot No33, 39
Area(In Sq. Mt.)8648

Other Details

Contractor Name (if any)M/S SHIVA & M/S GYANENDRA CONTRACTOR
Contractor AddressPILKHUWA HAPUR
Architect NameANUJ AGARWAL
Architect AddressA-244 KAUSHAMBI GHAZIABAD
Architect Licence NumberCA/96/19503
Structural Engineer NameSADA NAND OJHA
Structural Engineer Address503, SACHDEVA CORPORATE TAWAR PLOT-08 SECTOR-8 ROHNI DELHI
Mobile number(Project Co-ordinator)9761480602