26.808083
81.015951
Demarcation of plot is proposed after development work completed.
Not proposed
Internal roads are proposed of 18.mt. and 12 Mt. wide is proposed as per sanctioned plan
Not Proposed
Water supply system are proposed through out PLO/3 harder proper pressure system.
Sewerage system are proposed with disposal to main trunk line sewer line at 45mt. and it will be finally disposed to near by STP developed in CG City.
Proper drainage system is planned as per requirement of area and finaly dicharged at drain at main road of 45 mt wid.
Parks will be developed with green plants and their necessary safety requirments.
Harticulture operations including 30 cm earth filling, Grassing tree plationplantation, grassing and vertical plantation.
11 KVA X LPE underground cable with proposed 11 KVA RMV and also street light are proposed.
Not Applicable.
Treatment and disposal system of sewage and sullage water will be done at nearby STB at CG City.
After completion of project infrastructure will be hadedover to the local Muncipal corporation.
Water conservation systme will be developed as per requirement of the project.
Not Applicable
Not applicable
Not applicable
Not Applicable
Not applicable
Showing 1 blocks with 1 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
51069.00 m²
549701.61 ft²