Project Site is located at GH-02 Sector-45, Noida.
Minimum 1.5m height boundary wall with MS railing/RCC finished with plaster and textured paint as per the approved drawing and details.
Internal roads in either Bituminous or RCC with broom finish.
1.5m wide cement concrete pavers with pathways.
Municipal supplied water from respective authority, UGT storage tanks of sufficient capacity. Water will be treated as per requirement for water supply and distributed to flats through water transfer pumping system to OHT and thereafter, supply to apartments through gravity.
Soil and water from the houses will be collected through network in shafts and 200mm diameter sewer lines in the external areas. The Sewerage so collected will be further treated in Sewerage treatment plant of capacity as per the approved design.
Storm water collected through rain water pipes and external storm water pipes of approved diameter and material. The collected storm water shall be collected and recharged in ground through required number of Rain water harvesting pits. The final overflow will be connected with Municipal drainage system as required.
Parks/Green areas will be developed as per the landscape design and planted with species of trees as the design and statutory requirements.
Planting of native species and concept of Miyawaki plantations. Path irrigated with recycled water.
Direct supply of electricity shall be through UPPCL/PVVNL and the electricity load and distribution design shall be as per the UPPCL/PVVNL standards.
NA
Suitable treatment technology of STP system will be designed and installed. The treated water will be further used in flushing system and irrigation purpose.
Solid waste shall be collected and processed in Organic Waste Composter.
Dual flush cistern and low flow fixtures shall be provided in toilets as per the green building designs and approval.
Energy conservation measures like use of solar energy for common lighting. Additionally, use of LED and energy efficient fixtures.
Fire protection and safety system consisting of fire sprinklers in each apartments, common areas, basement, Fire Hydrants at each floors, common areas, at roads, entries etc. Fire Alarm Panel in each towers common area and basement parking shall be provided as per NBC 2016(Part IV). UGT Fire tanks capacity will be of adequate sizes.
Driver toilets, landscaped gardens, kids play area, play equipment, sitting benches, shall be provided.
Fire Tower with dedicated lift, fire staircase, Fire Hydrant shaft will be provided in each tower with safe exit at Ground Floor.
Swimming pool will be provided as per the approved scheme.
Showing 2 blocks with 84 units
Total Area
29055.03 m²
312745.44 ft²
Total Units
164
3 different types
Blocks & Floors
2
42 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
19289.81 m²
207633.59 ft²