NewActive

Eutopia Phase-1

Ghaziabad, Uttar Pradesh
01-10-2020
Launch Date
New
Type
30-08-2026
Completion Date

Overview

Project Area

2.2496 acres

Launch Date

01-10-2020

Completion Date

30-08-2026

RERA ID

UPRERAPRJ351699

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)9104
Project NameEutopia Phase-1
Registration Fee (in Rs.)51000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)71
DistrictGhaziabad
Original Start Date-
TehsilGhaziabad
Proposed Start Date01-10-2020
Sanctioning Competent AuthorityU.P. Awas Evam Vikas Parishad
Project Cost (in Lacs)25126
Proposed Completion Date30-08-2026

Location

Latitude

28.657163

Longitude

77.404829

Bank Details

Account Details
Name of the AccountCollection Account
Account Number025405500755
Bank NameICICI Bank Limited
Branch NameGreater Noida Omega 1
Branch AddressGreater Noida
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0002183
Transaction Account Details
Name of the AccountTransaction Account
Account Number025405500756
Bank NameICICI Bank Limited
Branch NameGreater Noida Omega 1
Branch AddressGreater Noida
Branch StateUttar Pradesh
Branch DistrictGautam Buddha Nagar
IFSC CodeICIC0002183

Development Works

Demarcation of Plots

Total plot area of 29625 Sqm. located in Plot no. 08/GH-01, Sector-8, Siddharth Vihar, Ghaziabad

Boundary Wall

Suitable boundary shall be provided

Road Work

Interlocking Pavers/Wbm ROAD/Tirimix

Footpaths

Interlocking Pavers

Water Supply Including Drinking Water Facilities

One Under Ground Tank shll be provided

Sewer System

Underground system using uPVC /NP2(SN-4)  pipes.

Drain

Underground system using uPVC/NP2 (SN-4)  pipes.

Parks

Landscaping area is provided asper local building bye-laws

Tree Planting

80 Nos. trees are to be planted out of that 50% will be evergreen tree.

Design For Electric Supply Including Street Lighting

Electricity Transformers shall be used along with necessary switch-gear for distributing electricity at LT voltage

Community Buildings

Community space shall be provided

Treatment and Disposal System of Sewage and Sullage water

STP shall be provided. Treated water shall be used for flushing, irrigation, carwash, pathways cleaning and excess sewage shall be discharged in the municipal sewer

Solid Waste Management And Disposal System

Manual collection shall be provided in the project

Water Conservation System

Rain water harvesting facilities shall be provided

Energy Management System Including Use of Renewable Energy

Solar panels shall be provided on terrace for renewable energy.

Fire Protection And Fire Safety System

Fire tender path shall be provided as per NBC. Fire fighting system shall be provided.

Social Infrastructure And Other Public Amenities Including Public Health Services

STP shall be provided

Emergency Evacuation Services

Staircases shall be provided  in Basement & all the Towers for fire/ emergency exit as per norms.

Other Miscellaneous Work

N/A

Documents

Registry Document

No: 7762 | Date: 19-12-2016

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 08-09-2020

Commencement Certificate

Uploaded: 28-08-2020

Other Plan(If Any)

Uploaded: 28-08-2020

Proforma of Application Form

Uploaded: 28-08-2020

Proforma of Allotment Letter

Uploaded: 28-08-2020

Proforma of Conveyance Deed

Uploaded: 28-08-2020

Waste Disposal Plan

Uploaded: 28-08-2020

Water Supply Plan

Uploaded: 28-08-2020

Electricity Supply Plan

Uploaded: 28-08-2020

Development Work Plan

Uploaded: 28-08-2020

Affidavit

Uploaded: 08-09-2020

CA CERTIFICATE

Uploaded: 08-09-2020

ARCHITECT CERTIFICATE

Uploaded: 08-09-2020

ENGINEERS CERTIFICATE

Uploaded: 08-09-2020

Permits

Orignal Permit No1773/APD/U-5/33-(1)/Online No MAP20191121203417923
Orignal Permit Date13-08-2020
Valid Upto12-08-2025
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto11-08-2028
End Date30-08-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)KLT CONSTRUCTIONS PVT. LTD.
Contractor AddressFLAT NO. - Y-1/1302, GANGA YAMUNA HINDON APARTMENTS, SEC-7, SIDDHARTH VIHAR, GHAZIABD, UTTAR PRADESH - 201009
Architect NameDIPANJAN MITRA
Architect AddressA-8101, GARDENIA GLORY, SEC 46, NOIDA
Architect Licence NumberCA/2003/31084
Structural Engineer NameDR. VINOD JAIN
Structural Engineer AddressC-35, PAMPOSH ENCLAVE, GREATER KAILASH - 1, NEW DELHI - 59
Mobile number(Project Co-ordinator)9289322602

Land Details

AFS

Showing 8 blocks with 432 units

Property Summary

Total Carpet Area

56850.45

611932.56 ft²

Total Units

466

4 different types

Blocks & Floors

8

30 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:122.00
Balconies:1690
Parking ratio:0.00 per unit

Block Tower A

110 units

Block Tower B1

55 units

Block Tower B2

56 units

Block Tower C

56 units

Block Tower D

56 units

Block Tower E

32 units

Block Tower F

56 units

Block Commercial

11 units

Khasra Details

Total Area

29625.00

318880.54 ft²

1 plot
Plot
TypePlot
Khasra/Plot No08/GH-01
Area(In Sq. Mt.)29625

Other Details

Contractor Name (if any)KLT CONSTRUCTIONS PVT. LTD.
Contractor AddressFLAT NO. - Y-1/1302, GANGA YAMUNA HINDON APARTMENTS, SEC-7, SIDDHARTH VIHAR, GHAZIABD, UTTAR PRADESH - 201009
Architect NameDIPANJAN MITRA
Architect AddressA-8101, GARDENIA GLORY, SEC 46, NOIDA
Architect Licence NumberCA/2003/31084
Structural Engineer NameDR. VINOD JAIN
Structural Engineer AddressC-35, PAMPOSH ENCLAVE, GREATER KAILASH - 1, NEW DELHI - 59
Mobile number(Project Co-ordinator)9289322602