The plot is part of over all sports city in sector 150 Noida. The Same is demarcated as per the overall approved master plan.
The Boundary wall shall be constructed on 2 sides towards the outer boundary of sports city. The boundary face towards inner side of the sports city shall be developed with MS frames and soft fence through plantation.
The internal roads shall be constructed in black asphalt road/bitumen with WBM and other required layers.
The foothpath shall be constructed in project with concrete finish or as per the landscape design.
All apartments shall be provided with domestic water for household activities and STP treated water for flushing. The STP treated water shall also be supplied for irrigation purposes. For the same water tanks are getting created in underground and on terrace. Separate tanks are provided for fire water.
The Sewer system of the project is designed with chambers and manholes and the entire sewer is routed to STP for treated. The treated water from sewer is supplied for irrigation in landscapes and flushing in toilets. The extra water from sewer shall be coonected to master services of the sports city for usage in other green areas of the sports city.
The Drain system is planned with combinations of drains ,chambers and manholes.The entire storm water is routed to rain water harvesting pits for recharging the ground water. The overflow from the recharge pits shall be connected to the master services of the sports city.
The Parks and other landscaped areas will be developed with kids playing areas, multipurose lawn,badminton court,putting green and other playing areas.
The trees of category ornamental ,shady and native species shall be planted in the entire project as per the species recommende in the landscape.
The entire electricity is planned as per the electricity norms and in addition DG power backup is provided in the essentrial common areas of the project. And limited power backup (depending on size of apartment) for necessary amenities is provided in the apartment as well.
Community Building will be constucted in project with mini-theatre,spa with steam and sauna ,swimming pools with changing rooms,yoga/medidation room, multipurpose hall ,Gymanasium,squash court,indoor playing areas etc.
The swer system of the project is designed with chambers and manholes. and the entire sewer is routed to STP for treated. The treated water from sewer is supplied for irrigation in landscape and flushing in toilets. The extra water from sewer shall be connected to master services of the sports city for usage in othrer green areas of the sports city.
The solid waste shall be encouraged for segregation with in all apartments. The dustbins shall be provided for segregated waste in the common areas. From where the BIO WASTE shall be converted to manure through OWC within the campus and other waste shall be handed over to the government vendors for further disposal.
For water conservation all toilets shall be provided with dual flush fixtures,low fittings shall be provided and Treated water from STP shall be used for irrigation and flushing.
For energy management the meters shall be installed at all critical locations and further maximum LED light fixtures shall be used in common areas. Solar street light shall be provided on the roads as per the authority recommendation. Water supplied through common solar heating system to all kitchens.
The fire protection and safety systems are provided as per the approved scheme from fire authorities with sprinklers and smoke/heat detectors and where recommended/required.
The Social infrastructure shall be provided with domestic water supply with tanks,STP treted water for flushing with tanks and irrigation ,storm /rain water drainage system,sewer drainage system,waste water drainage system,firefighting system including sprinklers ,FHC detectors ,fire water tank ,authority main power supply ,Dg power backup for essential common supply,lifts.
For emergency evacuation the staircases are provided ,lifts rea provided and a dedicated assembly areas are also defined in the campus.Adequate signage is also provided.
Not applicable
Showing 7 blocks with 347 units
Total Area
56527.67 m²
608458.19 ft²
Total Units
688
1 different types
Blocks & Floors
7
29 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
30166.00 m²
324703.81 ft²