Project Area
Launch Date
Completion Date
RERA ID
26.515443
80.570307
This is a Single plot, having total entry gate / exit gate from front road, the Site is Surrounded by other plots.
Boundary wall is proposed.
Complete CC internal road along with paver pathways is proposed to be constructed as per CPWD specifications for required load and width. Roads shall have some patterns using granite pavers at junction and BLOCK entry points.
Not Applicable
Underground water to be supplied through terrace tanks
Centralized Sewerage system shall be provvided. All Sewerage Disposal shall be go to the STP for treatment and after treatment, water shall be recycled and will used in gardening, washing and flushing system. Overflow from the STP shall be connected with the Municipal sewerage systems.
A well designed rain water harvesting system has been planned along with the recharge pits for the building to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drains channels and pipes.
There are 5 types of trees proposed at site- Which are Kachnar, gulmauhar, amaltas, kusum and neem.
There are 5 type of trees proposed at site - which are kachnar, gulmauhar, amaltas, kusum and neem.
A well designed electricity distribution system, as per norms of electricity Board, will be in place alog with centralized Transformer, HT panel, LT panel, Feeder Pillar and DG back for common service like External lighting, STP , pump room etc. 20 percent street lighting shall have solar panel.
Club Building with basic Recreational Facilities like Gym, Library and Common Room.
Centralized Sewerage system shall be provided. All sewerage disposal shall be go to the STP for treatment and after treatment , water shall be recycled and will used in gardening, washing and flushing system. Overflow from the STP shall be connected with the Municipal Sewerage system. There is not separate treatment plant or arrangement.
Proper garbage disposal/ collection point has been proposed. Nagar Nigam to collect garbage from this point for the solid waste management.
A well designed rain water harvesting system has been planned along with 6 no. recharge pits for the whole building complex to conserve water. Rain water from internal roads, roof tops and gardens shall be directed towards recharge pits through drain channels and pipes.
we will use LED lights fittings in external and common areas as well as 20 percent solar street lights. In STP and pump room all the equipment shall have energy efficient motors/ pumps .
This Project has only Residential flats. Hence we will provide Fire Fighting facility in common areas while individual owner can install their own systems as per their and local authorities requirement.
Not Applicable
Staircase will be provided
Not Applicable
Showing 1 blocks with 26 units
Total Carpet Area
2834.97 m²
30515.33 ft²
Total Units
26
3 different types
Blocks & Floors
1
7 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2010.20 m²
21637.59 ft²