Site well demarcated with project boundary and surrounding roads fully constructed.
two side constructed with road on one side.
9 meter road network to be developed as per approval. 4.8 meter. carriageway with side footpaths proposed.
CC/paver footpaths with space for drainage/services to be constructed.
OHT constructed and water supply line to be laid as per design with 20mm connection to each villa.
CC pipes to be laid connecting to main sewer line of the Township
KC/U-drain along main roads with proper slope.
All parks to have green cover with walking pavements and plantation.
4.5 to 6 meter high trees along main roads.
Complete street lighting with 7.5 meter high light poles
Club functional and is part of Township
STP constructed and is part of Township
Already in place as part of Township
Required Rain Water Harvesting have been proposed.
Solar back up to 25% street lighting proposed
With fire hydrants in main water supply line
NA
Ext to 18 meter roads via 9 meter road
NA
Total Area
6579.75 m²
70823.77 ft²
Processing Time
290 days
From application to approval
02-12-2022