26.719804989370722
80.89288499600843
Project plot demarcated at Site
Under construction as per approval.
9/ 7.5 mt wide roads
1.00 mt/ 1.5mt wide paving
As per services drawing. Supply from existing O.H.T.
As per services drawing. Connected to S.T.P.
As per services drawing.Connected to main drain.
To be developed as per approval.
Required numbers to be planted.
Electric supply available.
Common club exists.
Existing S.T.P.
Available with Nagar Nigam.
Rain water harvesting as per drawings.
Solar energy to be harvested.
as per norms.
Part of main layout.
9 mt. Wide exit gates of complex.
N.A
Showing 1 blocks with 3 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
15180.00 m²
163396.00 ft²
Processing Time
289 days
From application to approval
02-12-2022
17-09-2023