NewActive

Eldeco East End at Shaurya

Lucknow, Uttar Pradesh
15-06-2021Launch Date
NewType
UPRERAPRJ513776RERA ID
15-03-2026Completion Date

Basic Details

Project TypeNew
Project CategoryResidential
Total area in round figure (Sq.mt.)12180
Project NameEldeco East End at Shaurya
Registration Fee (in Rs.)66000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)58
DistrictLucknow
Original Start Date-
TehsilSarojini Nagar
Proposed Start Date15-06-2021
Sanctioning Competent AuthorityLucknow Industrial Development Authority
Project Cost (in Lacs)505
Proposed Completion Date15-03-2026

Location

Latitude

26.718578

Longitude

80.897944

Bank Details

Account Details
Name of the AccountEldeco Housing And Industries Limited Eldeco East End At Shaurya-Rera Collection Account
Account Number777705321888
Bank NameICICI Bank
Branch NameIndra Nagar
Branch Address19/753,Ring Road Indira Nagar,Lucknow-226016
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeICIC0000591
Transaction Account Details
Name of the AccountEldeco Housing And Industries Limited
Account Number777705321999
Bank NameICICi Bank
Branch NameIndra Nagar
Branch Address19/753,Ring Road Indira Nagar-Lucknow-226016
Branch StateUttar Pradesh
Branch DistrictLucknow
IFSC CodeICIC0000591

Development Works

Demarcation of Plots

Total site is very well demarcated and most of the site boundary is constructed.

Boundary Wall

2.7 mt. high boundary wall is planned for this mini Township.

Road Work

9.00 mt Black top roads are planned as per the approved layout.

Footpaths

0.9 mt to 12 mt. wide pathways along roads .To be constructed with C.C/paver blocks.

Water Supply Including Drinking Water Facilities

Total township to have a separate OHT/UGT with boring to extract under ground water. Supply to the township shall be through supply lines as per design.

Sewer System

A well designed sewer system has been planned with provision of STP.

Drain

Total under ground drainage system has been planned along the roads with adequate no. of Rain water harvesting points.

Parks

15 percentage of the total land area has been planned as parks .Kids play facilities and walking/ jogging facilities shall be part of these parks.

Tree Planting

3.5 to 4.5 mt high plantation along the road has been planned.

Design For Electric Supply Including Street Lighting

Adequate no. of street lighting poles are planned as per norms.Under ground cable system has been designed.

Community Buildings

Club in township( Eldeco Shaurya) already developed.

Treatment and Disposal System of Sewage and Sullage water

Separate STP to be provided.

Solid Waste Management And Disposal System

Shall be lined up with Lucknow Nagar Nigam for door to door collection.

Water Conservation System

Adequate no. of recharge pits as per drawings .Endeavour is to recharge complete roof top storm water.

Energy Management System Including Use of Renewable Energy

Recycled water to be used for cisterns and irrigation.25 percentage of the street lights shall have solar back up.

Fire Protection And Fire Safety System

N.A

Social Infrastructure And Other Public Amenities Including Public Health Services

N.A

Emergency Evacuation Services

9.00 mt. roads to facilitate easy exit.

Other Miscellaneous Work

N.A

Documents

Sale Deed

No: 20564 | Date: 30-03-2016

Sale Deed

No: 15529 | Date: 11-04-2013

Sale Deed

No: 15838 | Date: 17-06-2013

Sale Deed

No: 15782 | Date: 05-06-2013

Sale Deed

No: 15562 | Date: 18-04-2013

Sale Deed

No: 20836 | Date: 17-05-2016

Sale Deed

No: 21829 | Date: 14-12-2016

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Extract of Khatauni

No: 1424-1429 | Date: -

Registry Document

No: 3 | Date: 10-08-2018

Registry Document

No: 00000 | Date: 09-06-2021

Details of Encumbrances

Uploaded: 29-05-2021

Commencement Certificate

Uploaded: 28-05-2021

Other Plan(If Any)

Uploaded: 28-05-2021

Proforma of Application Form

Uploaded: 28-05-2021

Proforma of Allotment Letter

Uploaded: 26-05-2021

Proforma of Conveyance Deed

Uploaded: 28-05-2021

Proforma of Completion Certificate(Occupancy)

Uploaded: 26-05-2021

Waste Disposal Plan

Uploaded: 26-05-2021

Water Supply Plan

Uploaded: 26-05-2021

Electricity Supply Plan

Uploaded: 26-05-2021

Development Work Plan

Uploaded: 26-05-2021

Affidavit

Uploaded: 28-05-2021

CA CERTIFICATE

Uploaded: 26-05-2021

ARCHITECT CERTIFICATE

Uploaded: 27-05-2021

ENGINEERS CERTIFICATE

Uploaded: 27-05-2021

Permits

Orignal Permit No2096
Orignal Permit Date16-03-2021
Valid Upto15-03-2026
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto14-03-2029
End Date15-03-2026
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesNot Specified
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)M-S J K Sahani Construction -Mr.J.K Sahani
Contractor AddressRaghav Nagar B D Girls Inter College, Deoria UP
Architect NameSanjay Kumar Gupta-
Architect Address108, Corporate Chamber-1,Vibhuti Khand Lucknow-26010
Architect Licence NumberCA/89/12382
Structural Engineer NameMr.Akhilesh Kumar Singh-ATS Structural Consultants
Structural Engineer AddressATS Structural Consultants-D-27,Indra Nagar,Lucknow
Mobile number(Project Co-ordinator)9670222298

Land Details

Plot

Showing 1 blocks with 3 units

Property Summary

Total Area

0.00 m²

0.00 ft²

Total Units

0

1 different types

Blocks & Floors

1

1 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:NaN m²
Balconies:0
Parking ratio:NaN per unit

Block undefined

3 units

Khasra Details

Total Area

12180.00 m²

131104.30 ft²

5 plots
Khasra
TypeKhasra
Khasra/Plot No41
Area(In Sq. Mt.)1550
Khasra
TypeKhasra
Khasra/Plot No42
Area(In Sq. Mt.)1620
Khasra
TypeKhasra
Khasra/Plot No51
Area(In Sq. Mt.)2970
Khasra
TypeKhasra
Khasra/Plot No52
Area(In Sq. Mt.)2420
Khasra
TypeKhasra
Khasra/Plot No43
Area(In Sq. Mt.)3620

Account Closure Details

Processing Time

107 days

From application to approval

Application Submitted

27-02-2024

Application Approved

13-06-2024

Other Details

Contractor Name (if any)M-S J K Sahani Construction -Mr.J.K Sahani
Contractor AddressRaghav Nagar B D Girls Inter College, Deoria UP
Architect NameSanjay Kumar Gupta-
Architect Address108, Corporate Chamber-1,Vibhuti Khand Lucknow-26010
Architect Licence NumberCA/89/12382
Structural Engineer NameMr.Akhilesh Kumar Singh-ATS Structural Consultants
Structural Engineer AddressATS Structural Consultants-D-27,Indra Nagar,Lucknow
Mobile number(Project Co-ordinator)9670222298