Done
R.C.C and brick work structure with MS railing and with plaster Finish and Paint as per Plan
2 layer WBM, CC Pavers on top and kerb stone
PCC and Pavers
Water supply through bore well/ Municipal supply collected in under ground water tank, further distribution from over head tank to individual units by gravity
Sewer system with RCC NP2 pipes connected to STP, treated water will be used for gardening and flushing, excess treated water would be disposed in municipal line.
Storm water Drain System with RCC NP2 pipes connected to Rain water Harvesting pits.
Parks will be provided as per approved plan
Tree planting will be provided as per approved plan
Electrical supply including street light (GI poles) will be provided as per the Scheme approval.
Club building proposed would be built as per approved plan.
Sewer system with RCC NP2 pipes connected to STP, treated water will be used for gardening and flushing, excess treated water would be disposed in municipal line.
Would be provided as per guidelines as given in EC approval.
Rain harvesting pits are planned ( as required) and used as man hole in horticulture.
Solar panel will be used as far as possible for energy conservation CFL/ LED bulbs would be used for common area lighting.
Fire Hydrant would be provided as per Norms.
Would be provided as per guidelines given in EC approval.
NA
Boundary wall and main gate would be made for security of the complex CCTV camera would be used on main gate for visitor monitoring.
Total Area
81826.24 m²
880769.46 ft²