27.204464
77.956564
The Project land will be demarcated . The Building Lines will be maintained as per the offsets mentioned in the approved layout.
Boundary wall of varying heights from 4 feet to 8 feet will be constructed in brick and mortar. The wall will be plastered and painted with all season pain. The boundary wall will be earthquake resistant.
A minimum of 200 mm thick cement concrete road will e constructed . The surface will be kept anti skid for level as well as ramp area. The slopes will be maintained for quick removal of rainwater.
Chequered tiles to the depth of 150mm over the prepared base will be placed in interlocking for walking area and the external parking area. The Strength of the tile will be M-25.
Ground water will be pumped to the roof tank through a submersible pump. The water will then be supplied to the common facilities of the project .
The sewer lines will be laid for the collection and disposal of sewer from the commercial building in to the muncipal sewer line. The inspection chambers will be constructed to maintain the sewer lines.
Covered line drains with the inspection grill strong enough the resist the plying traffic will be laid. The slopes will be maintained for the quick removal of drain water in to the municipal drain.
Not Applicable
Tree with limited girth will be planted at the select location along the boundary wall.
The Primary connection and the individual connection to shops and common areas will be provided as per the load and distribution calculations done by MEP consultant approved by the electricity board. The is also a provision for generator based electricity in case of power failure.
Not Applicable
Not Applicable- the sewage will be disposed in to the municipal sewer line
The waste Chute and the dustbins for collection of the will be installed at the common areas.
A rain water harvesting pit will in constructed to collect the surface and roof run offs. The filter system that can be maintained periodically will be installed at collection chamber to reduce the pollutants and help recharge the water table through perforated pipes driven in to the ground to the depth of 90 m approximately
Not Applicable- Still the Green building methods will be adopted
The Fire system will be installed as per the prevailing fire department norms. The water and canned gas arrangement will be made on all floors .
Not Applicable
The stair cases are designed to assist the fire exists. Fires exit doors will also be constructed to assist the smooth and quick movement out in case of fire
As per the project requirement
Showing 1 blocks with 49 units
Total Area
1900.58 m²
20457.65 ft²
Total Units
48
2 different types
Blocks & Floors
1
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
1675.55 m²
18035.45 ft²