Project Area
Launch Date
Completion Date
RERA ID
26.849563
80.960721
Plot is already demarcated and the construction work is in progress with in the boundary.
Plot is already demarcated and the construction work is in progress with in the boundary.
5 meter wide road Network ( Wrt to NBC 2016 and Byelaws 2025) is proposed around the towers. The finishing on the road network is Cement Concrete.
Footpath along the Setback are proposed be finished with interlocking tiles.
A borewell in proposed in the open setback green area and the supply lines are directly connected to the OHTs on the tower.
A 300 mm dia NP2 types pipes are proposed to be laid and finally connected to the main Municipal sewer line along the road.
Storm water system will be provided which will be connected to the Municipal drain/Trunk line as per specified plan.
A small green patch in the setback is provided.
A few Trees will be planted in the setback as per sanctioned plan.
A Centralized transformer, HT panel, LT panel, services like external lighting. is proposed as per sanctioned plan. for the L.T., L.V., and H.T. lines
There is no community building proposed in our project.
Sewage System is to be laid and finally connected to the Main line.
For Waste management and garbage collection chambers are proposed as per layout. After completing the project, it will be handed over to the local municipal corporation.
A well-designed rainwater harvesting system shall be provided.
LED lights proposals for street lights.
The Building Height is less than 15 Meters.
Not applicable
Not applicable
Not applicable
Showing 2 blocks with 8 units
Total Carpet Area
1519.27 m²
16353.27 ft²
Total Units
72
1 different types
Blocks & Floors
2
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
2321.23 m²
24985.49 ft²