Launch Date
Completion Date
RERA ID
28.701437
77.630346
THE PLOT WILL BE DEMARCATED AS PER THE SANCTION AND SURVEY DRAWING
A BOUNDARY WALL OF RCC/BRICKS WITH PLASTER AND PAINTING WILL BE PREPARED
CEMENT CONCRETE INTERNAL ROADS, ACCESS TO ALL TOWERS WILLL BE PROVIDED
PAVERS PATH IN LANDSCAPE GREEN
WATER TO BE PROVIDED BY THE HPDA AND WE WILL MAKE UGT OF CAPACITY AS PER THE NORMS
MAIN SEWER LINE HAS BEEN DESIGNED AS PER THE NORMS AND PARTIALLY LAY IN BASEMENT CEILING AND FINALLY CONNECT TO STP
UNDERGROUND SYSTEM USING uPVC PIPE (SN-4) AND MASONARY CHAMBER SEWER PIPES
BEAUTIFUL PARKS WILL BE MADE AS PER THE LOCAL BUILDING BY-LAWS FOR ALL RESIDENTS TO ENJOY
AS PER THE APPROVED BUILDING PLAN, NUMBER OF TRESS WILL BE PROVIDED
DESIGN HAS BEEN DONE AS PER UP ELECTRICITY BOARD GUIDELINES AND SHALL BE PROVIDED NECESSARY SWITCH GEAR ETC FOR DISTRIBUTING ELECTRICITY LT VOLTAGE
N.A.
STP OF CAPACITY AS PER NORMS SHALL BE PROVIDED, TREATED WALL SHALL BE USED FOR FLUSHING, IRRIGATION, CARWASH, PATHWAYS CLEANING AND EXCESS SEWAGE SHALL BE DISCHARGED IN THE MUNCIPAL SEWER
MANUAL COLLECTION AND ORGANIC WASTE CONVERTER SHALL BE PROVIDED IN THE PROJECT
RECYCLING OF TREATED WATER AND RAIN WATER SYSTEM TO BE PROVIDE
N.A.
FIRE TENDER PATH SHALL BE PROVIDED AS PER NBC, FIRE FIGHTING SYSTEM ALONG WITH PUMPS AND WATER STORAGE, TANKS SHALL BE PROVIDED AS PER THE NBC AND NOC OF FIRE DEPARTMENT
N.A.
AS PER APPROVED BUILDING PLAN AND FIRE APPROVALS FIRE STAIRCASE ARE BEING PROVIDED
OTHER MISCELLANEOUS WORK IS PROVIDED AS PER APPROVED BUILDING PLAN
Showing 15 blocks with 270 units
Total Carpet Area
119235.92 m²
1283443.52 ft²
Total Units
2156
4 different types
Blocks & Floors
15
13 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
67626.00 m²
727919.50 ft²