26.925542
80.884167
There are two plots triangular shaped abutting 9 mtr wide road on south side. Site is surrounded by other plots from other sides.
1.8 - 2.1m high and 200 mm thick Boundary wall designed. Brick Work of 9 inches and rcc work in column and beam may be used as per design. Entrance and exit gates are developed with boundary.
Trimix finish/ bitumen will be used as per design suggested by the Architect for internal road.
All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes.
Ground water may also be used, All users can use their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.
Centralized Sewerage system shall be Provided. All Sewerage water shall go to the central STP for treatment. After treatment ,water shall be recycled and it will be used in gardening, flush tanks.Oveflow from the central STP shall be connected with the Municipal sewerage system.
Storm water system shall be Provided. Storm water from Roads and other landscape area shall be connected to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connected with Municipal drain line.
There are many green/ landscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities.
There are different type of tree plantation is proposed at site in order to maintain greenery and natural view.
We have designed the system as per local electricity board and considered centralized Transformer,HT panel,LT Panel, Feeder Pillar and DG back for common service like External lighting, STP, Pump room etc.
Community building already exist in township.
Centralized Sewerage system shall be Provided. All Sewerage water shall go to the central STP for treatment, after treatment ,water shall be recycled and it will be used in gardening, flush tanks. Overflow from the STP shall be connected with the Municipal sewerage system.
There are proper garbage collection area provided for the solid waste management.
A well designed rain water harvesting system shall be provided for the whole building/villa complex to conserve water.
We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor.
All the fire norms shall be followed as NBC and approval of fire department
Green/ landscape area in front/ beside of Villas including green parks, play areas for children and different recreational activities.
Not Applicable.
Lush green shrubs at every vacant space on ground.
Total Area
1216.00 m²
13088.90 ft²