dimarcation of group housing Plots completed in 2011
Boundary wall completed in 2012
CC Road completed in 2016
Footpaths constructed in park area.
water supply including drinking water facilities completed .
sewer system completed and connected main trunk sewer line.
drains completed and covered with cover block and connected master drain.
construction of park & development of parks completed.
plantation work completed.
Design For Electric Supply Including Street Lighting completed & fixtures fitted.
Club, swimming pool, Gym provided.
For Treatment and Disposal System of Sewage and Sullage water constructed at madhuban bapudham Scheme.
Solid Waste Management For And Disposal System for whole madhuban bapudham scheme provided.
For Water Conservation System Rain water harvesting provided.
Solar electric panel installed. .
Fire Protection And Fire Safety System Installed.
Social Infrastructure And Other Public Amenities Including Public Health Services are available in Scheme.
Emergency Evacuation Services are available as per norms.
Trunk sewer, Trunk drainage, Major Roads, parks, central verge are constructed and developed.
Showing 12 blocks with 205 units
Total Area
37648.30 m²
405242.54 ft²
Total Units
410
3 different types
Blocks & Floors
12
18 floors across all blocks
Parking
0
0 garages, 0 open