Project Area
Launch Date
Completion Date
RERA ID
28.691270
77.616755
No
No Boundary wall will be made
External roads Work will be done by U.P.P.W.D. Hapur while internal roads, will be constructed by HPDA with bituminous / CC
Not Proposed
External Water supply work will be done by U.P. Jal Nigam with over head tank.
RCC Hume pipes will be lay as a sewer line in connect to septic tank.
Drains are made of RCC and Brick works
Boundary wall will be made
Decorative planes are planned along boundary wall
Each flats have independent electric connection with LED street Lighting as proposed while external electrification work will be done by U.P.P.C.L.
No
Through septic Tank
Solid waste will be collect door to door by service facilitater and finally disposed through
Roof top water harvesting system will be deployed if necessary
According to requirement
Not Applicable
Social Infrastructure is available with in peripheral of 2km.
Available with in peripheral of 2km.
As per requirement of Project
Showing 6 blocks with 24 units
Total Carpet Area
6010.58 m²
64697.28 ft²
Total Units
264
1 different types
Blocks & Floors
6
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
8000.00 m²
86111.20 ft²