28' 43' 29.43' N 28' 43' 28.97' N
77' 20' 5.86' E 77' 20' 6.75' E
East-Group housing plots, West- Block-C of Indraprastha Scheme, North- 18m wide road, South- Park and UGR
Boundary wall had been constructed on all outer sides of building with column and brick work and plaster has been done.
Main Approach road mohan nagar to loni already exist. 18m wide road has constructed on north side of buildings. Cement Concrete road is constructed in front of houses with M-25 grade cement concrete
1.5 m wide Footpath has been made with interlocking tiles.
Underground UGR has been constructed for drinking water and 110 mm dia PVC pipe line from UGR is connected to 80mm PVC pipe line which provide the water to the flats.
Providing and laying 300 mm NP-2 RCC hume pipe for sewer disposal connected with the existing main sewer line.
Surface drain is constructed both sides of the cement concrete road and it will be covered with pre-cast perforated RCC cover block.
providing and fixing of curve stone surrounding of the park
tree planting will be provide
electricity transformers has been installed and street light will install all around the proposed building
it is not proposed in the scheme.
Disposal System of Sewage and Sullage water by existing sewer line.
it is not proposed in the scheme.
water conservation system will be provided with rain water harvesting system after completion of the building work
Through power backup
Fire Protection And Fire Safety System will be installed
Social Infrastructure And Other Public Amenities Including Public Health Services is nearby the scheme.
Emergency Evacuation Services is proposed in all side of buildings
Retro reflective signage board will be provided at the main gates
Showing 6 blocks with 72 units
Total Area
8712.00 m²
93775.10 ft²
Total Units
192
2 different types
Blocks & Floors
6
12 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
0.85 m²
9.16 ft²