26.817222
83.391169
AREA HAS BEEN DEMARCATED
THERE IS NO PROVISION OF BOUNDARY WALL IN THE PROJECT
BITUMINOUS ROADS HAVE BEEN PROVISIONED
FOOTPATH SHALL BE CONSTRUCTED ALONG WITH ROADS
DRINKABLE WATER SHALL BE SUPPLIED THROUGH BORED WELL
SEWERAGE NETWORK AS PER DESIGN SHALL BE SET UP
DRAINS AS PER DESIGN SHALL BE CONSTRUCTED
PARKS SHALL BE DEVELOPED INN THE SCHEME
TREES SHALL BE PLANTED WITHIN OPEN SPACES AND PARKS
ELECTRICAL LOAD AS PER SANCTIONED UPPCL DRAWING SHALL BE INSTALLED
N/A
SEWER SHALL BE TREATED AT STP
GARBAGE COLLECTION CENTRES HAVE BEEN PROVISIONED AND MUNICIPAL CORPORATION WILL HANDLE THE GARBAGE
N/A
N/A
N/A
N/A
N/A
N/A
Showing 32 blocks with 125 units
Total Area
34905.00 m²
375713.93 ft²
Total Units
1500
1 different types
Blocks & Floors
32
4 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
53470.00 m²
575545.73 ft²