OngoingActive

Cleo County, Ph 1 ( comprising of tower D1 D2 C1 C

Gautam Buddha Nagar, Uttar Pradesh
01-05-2012
Launch Date
Ongoing
Type
31-08-2018
Completion Date

Overview

Project Area

6.7959 acres

Launch Date

01-05-2012

Completion Date

31-08-2018

RERA ID

UPRERAPRJ5931

Basic Details

Project TypeOngoing
Project CategoryResidential
Total area in round figure (Sq.mt.)27502
Project NameCleo County, Ph 1 ( comprising of tower D1 D2 C1 C
Registration Fee (in Rs.)143000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)76
DistrictGautam Buddha Nagar
Original Start Date01-05-2013
TehsilGautam Buddha Nagar
Proposed Start Date01-05-2012
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)52444
Proposed Completion Date31-08-2018

Location

Latitude

28.598451

Longitude

77.391327

Bank Details

No bank details available

Development Works

Demarcation of Plots

Total Plot Area- 99820sqm (Area to be developed in this phase-27502sqm) N-30m Wide Road and 30m wide green belt, S- 30m wide road, E- 30m Green belt and 30m wide Road, W- Towers of Phase-II and Green Area

Boundary Wall

Yes, Masonary Pucca and Railing Boundary wall

Road Work

Yes, RCC Trimix Road with Kerb stone on sides .Stone Paving infront of Towers.

Footpaths

Yes, Cement Concrete , stone and Grass Pavers

Water Supply Including Drinking Water Facilities

Yes,Noida Authority water supply system collected in Under Ground Water reservoirs at two locations . Terrace Tanks, filled with Hydro Pneumatic pumps.

Sewer System

Yes, RCC hume pipe with Manhole ,Chambers and Collection chamber and connections with Authority sewer System.

Drain

Yes, saucer drain and RCC hume pipe system

Parks

Yes, Beautiful landscape with civil work with masonary and stone, horticulture work and various types of plantation, shrubs.

Tree Planting

Yes, Tree planting all along road in the project.

Community Buildings

Yes, With banquet, Gym, Indoor games facilities all weather pool and swimming pool common for all phases

Treatment and Disposal System of Sewage and Sullage water

Yes, S.T.P and through Authority IS Sewer Line and Drain in south side of project (common for all phases)

Solid Waste Management And Disposal System

Yes, Organic Waste convertor, collection Bins and segregation table.

Water Conservation System

Yes, Rain water Harvesting Pits and dual Plumbing system . Drip Irrigation with sprinkelrs

Fire Protection And Fire Safety System

Yes, Diesel Pump - 1 No, Electrical Pump for Hydrant - 1No , Electrical Pump for Sprinkler - 1 No, Jockey Pumps - 2 Nos , Water Curtain Pumps -1 No , Basement internal & external hydrants sprinklers.

Social Infrastructure And Other Public Amenities Including Public Health Services

Yes, Proper Water supply and sanitary facilities provisions

Emergency Evacuation Services

Yes

Other Miscellaneous Work

Yes, Guard Room, Entrance and exit gates maintenance room, commercial facilities.

Documents

Lease Deed

No: 3072 | Date: 03-11-2015

Other

Other

Details of Encumbrances

Uploaded: 02-09-2021

Commencement Certificate

Uploaded: 27-12-2018

Other Plan(If Any)

Uploaded: 16-05-2018

Proforma of Application Form

Uploaded: 16-05-2018

Proforma of Allotment Letter

Uploaded: 27-12-2018

Proforma of Conveyance Deed

Uploaded: 28-06-2018

Proforma of Completion Certificate(Occupancy)

Uploaded: 28-06-2018

Waste Disposal Plan

Uploaded: 28-06-2018

Water Supply Plan

Uploaded: 31-01-2019

Electricity Supply Plan

Uploaded: 03-07-2018

Development Work Plan

Uploaded: 03-07-2018

Affidavit

Uploaded: 16-05-2018

CA CERTIFICATE

Uploaded: 29-02-2020

ARCHITECT CERTIFICATE

Uploaded: 29-02-2020

ENGINEERS CERTIFICATE

Uploaded: 29-02-2020

Authentic copy of Approval of Project

Uploaded: 27-04-2018

Sanctioned Layout Plan (Of Entire Project)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Floor plans of all types

Uploaded: 27-04-2018

Registry Document In Case of Own Land

Uploaded: 30-04-2018

Proforma of Conveyance Deed

Uploaded: 06-05-2018

Proforma of Completion Certificate(Occupancy)

Uploaded: 06-05-2018

Waste Disposal Plan

Uploaded: 06-05-2018

Electricity Supply Plan

Uploaded: 06-05-2018

Permits

Orignal Permit NoNOIDA/MVN/2016/III-289/923
Orignal Permit Date05-08-2016
Valid Upto04-08-2021
Revalidated Permit NoNOIDA/MVN/2016/III-289/923
Revalidated Permit Date05-08-2016
Revalidated Permit Valid Upto04-08-2021
Permit Extendable Upto04-08-2021
End Date31-08-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified
Orignal Permit NoNOIDA/MVN/2013/III-289/651
Orignal Permit Date03-05-2013
Valid Upto02-05-2018
Revalidated Permit NoNOIDA/MVN/2013/III-289/651
Revalidated Permit Date03-05-2013
Revalidated Permit Valid Upto04-08-2021
Permit Extendable Upto04-08-2021
End Date31-08-2018
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)Modern Construction (delhi)
Contractor Address902, Akashdeep Building, Barakhamba Road, New Delhi- 110001
Architect NameMR VISHAL SHARMA
Architect AddressC/O CONFULENCE CONSULTANCY SERVICE , B-421 NEW FRIENDS COLONY , NEW DELHI
Architect Licence NumberCA/9823261
Structural Engineer NameM/S VINTECH CONSULTANTS
Structural Engineer AddressC35, PAMPOSH ENCLAVE , GK-1, NEW DELHI
Mobile number(Project Co-ordinator)9899270803

Land Details

AFS

Showing 7 blocks with 300 units

Property Summary

Total Carpet Area

94291.38 m²

1014942.99 ft²

Total Units

770

3 different types

Blocks & Floors

7

28 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:122.46 m²
Balconies:1128
Parking ratio:0.00 per unit

Block A-1

31 units

Block A-2

31 units

Block C-1

58 units

Block C-2

58 units

Block C-3

58 units

Block D-1

32 units

Block D-2

32 units

Khasra Details

Total Area

99820.00 m²

1074452.50 ft²

1 plot
Plot
TypePlot
Khasra/Plot NoGH-05, Sector-121
Area(In Sq. Mt.)99820

Other Details

Contractor Name (if any)Modern Construction (delhi)
Contractor Address902, Akashdeep Building, Barakhamba Road, New Delhi- 110001
Architect NameMR VISHAL SHARMA
Architect AddressC/O CONFULENCE CONSULTANCY SERVICE , B-421 NEW FRIENDS COLONY , NEW DELHI
Architect Licence NumberCA/9823261
Structural Engineer NameM/S VINTECH CONSULTANTS
Structural Engineer AddressC35, PAMPOSH ENCLAVE , GK-1, NEW DELHI
Mobile number(Project Co-ordinator)9899270803