Basic Details

Project TypeOngoing
Project CategoryCommercial
Total area in round figure (Sq.mt.)9075
Project NameCAPITAL CITY
Registration Fee (in Rs.)101000
AddressNot specified
Village/Locality/Sector etc.Not specified
StateUttar Pradesh
Project Duration (In month)48
DistrictGautam Buddha Nagar
Original Start Date01-11-2010
TehsilGautam Buddha Nagar
Proposed Start Date01-01-2017
Sanctioning Competent AuthorityNoida Authority
Project Cost (in Lacs)51769
Proposed Completion Date29-12-2020

Location

Latitude

28'33'3.91'N

Longitude

77'19'31.25'E

Bank Details

Account no.1645699
Name Of Account HolderBPTP Ltd
Bank NameRBL Bank
Branch AddressGround Floor, M-6, Hauz Khas, New Delhi
Branch NameHauz Khas
IFSC CodeRATN0000141

Development Works

Demarcation of Plots

Demarcation for an area of 9075 Sq. M. completed at site.

Boundary Wall

Boundary wall for an area of 9075 Sq. M. is under construction & shall be completed soon.

Road Work

Road work shall be completed after completion / laying of external services.

Footpaths

Footpaths shall be completed after completion / laying of external services.

Water Supply Including Drinking Water Facilities

Internal / external water supply system shall be Completed by Mar-19 (proposed) & the connection for the same from Noida authority shall be done after obtaining OC for the project. The water supply/ drinking water will be made available by Noida authority after OC of the building

Sewer System

External / Internal sewage system shall be completed & connection for overflow of Excess raw sewage shall be obtained from Noida authority after OC of the building. The civil work of STP is completed and installation of electro mechanical system shall be completed by Mar-19 (proposed).

Drain

External strom water drainage system for the building shall be completed by Mar-19 (proposed) & connected for overflow of drain Water shall be provided by Noida authority after obtaining OC of Building.

Parks

Green / landscape area shall be provided as per norms /by laws.

Tree Planting

Tree Planting shall be provided /completed after completion of external development work as per norms /bylaws .

Design For Electric Supply Including Street Lighting

Design for electric supply including street lighting Shall be provided / completed by Mar-19 (proposed). The connection from electrical department Noida for the same will be obtained after obtaining OC certificate. The electrical supply shall be provided by concern electrical department Noida.

Community Buildings

Not applicable.

Treatment and Disposal System of Sewage and Sullage water

STP has been provided for adequate capacity and the civil work for the same has been completed. Installation electro mechanical system shall be provided / completed amd connection for overflow of excess sullage water shall be obtained from Noida authority after obtaining OC of the building.

Solid Waste Management And Disposal System

Solid Waste Management And Disposal System shall be provided as per Norms/bylaws.

Water Conservation System

Rain water harvesting as per norms / bylaws.

Energy Management System Including Use of Renewable Energy

Street lighting with solar photovoltaic shall be provided / completed. Solar system installation is under progress.

Fire Protection And Fire Safety System

Fire protection and fire safety system shall be provided / completed as per approved fire lightning scheme.

Social Infrastructure And Other Public Amenities Including Public Health Services

As per Norms / bylaws.

Emergency Evacuation Services

Emergency Evacuation Services shall be provided as per approved building sanction plan.

Other Miscellaneous Work

Other Miscellaneous Work will provided the required development work as per norms / bylaws.

Documents

Lease Deed

No: 253 | Date: 09-02-2009

Lease Deed

No: 634 | Date: 24-02-2010

Lease Deed

No: 634 | Date: 24-02-2010

Allotment Letter issued by Competent Authority

No: 2277 | Date: 06-02-2009

Allotment Letter issued by Competent Authority

No: 2277 | Date: 06-02-2009

Allotment Letter issued by Competent Authority

No: 272 | Date: 12-03-2008

Proforma of Conveyance Deed

Proforma of Completion Certificate(Occupancy)

Details of Encumbrances

Uploaded: 10-08-2018

Commencement Certificate

Uploaded: 23-08-2018

Proforma of Application Form

Uploaded: 19-09-2018

Proforma of Allotment Letter

Uploaded: 10-08-2018

Waste Disposal Plan

Uploaded: 10-08-2018

Water Supply Plan

Uploaded: 10-08-2018

Electricity Supply Plan

Uploaded: 10-08-2018

Development Work Plan

Uploaded: 19-09-2018

Affidavit

Uploaded: 10-08-2018

CA CERTIFICATE

Uploaded: 31-01-2019

ARCHITECT CERTIFICATE

Uploaded: 31-01-2019

ENGINEERS CERTIFICATE

Uploaded: 31-01-2019

Details of Encumbrances

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Authentic copy of Approval of Project

Uploaded: 31-07-2017

Sanctioned Building/ Block Plan (Add Plans for All Buildings or Blocks)

Uploaded: 31-07-2017

Commencement Certificate

Uploaded: 31-07-2017

Proforma of Allotment Letter

Uploaded: 31-07-2017

Affidavit

Uploaded: 31-07-2017

Water Supply Plan

Uploaded: 31-07-2017

Waste Disposal Plan

Uploaded: 31-07-2017

Other Plan(If Any)

Uploaded: 31-07-2017

Electricity Supply Plan

Uploaded: 31-07-2017

Floor plans of all types

Uploaded: 31-07-2017

Registry Document In Case of Own Land

Uploaded: 24-01-2018

Registry Document In Case of Own Land

Uploaded: 24-01-2018

Details of Encumbrances

Uploaded: 14-02-2018

Details of Encumbrances

Uploaded: 14-02-2018

Permits

Orignal Permit NoIV-675/517
Orignal Permit Date13-03-2012
Valid Upto12-03-2017
Revalidated Permit No-
Revalidated Permit Date-
Revalidated Permit Valid Upto-
Permit Extendable Upto11-03-2022
End Date30-06-2020
Uploaded Approve LayoutOpen
Uploaded Sanctioned LetterOpen
Uploaded Approved MapOpen
Uploaded Floor Plan Of All TypesOpen
Uploaded Project SpecificationsOpen
Uploaded Sajra DetailNot Specified

Project Team

Contractor Name (if any)M/s Ahluwalia Contracts (India) Ltd
Contractor Address1, Okhla Industrial Area, Phase-3, Near Modi Mill, New Delhi
Architect NameMr. Sunil Kumar Jha
Architect AddressBPTP Crest, Plot No. 15, Udyog Vihar, Phase-IV, Gurgaon
Architect Licence NumberCA/99/24568
Structural Engineer NameM/s MANISH CONSULTANTS
Structural Engineer AddressF-19, Ground Floor, South City - 2, Sector-50, Gurugram – 122018
Mobile number(Project Co-ordinator)9818002513

Land Details

AFS

Showing 1 blocks with 16 units

Property Summary

Total Area

3165.00

34067.74 ft²

Total Units

146

1 different types

Blocks & Floors

1

16 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:21.68
Balconies:0
Parking ratio:0.00 per unit

Block TOWER-1

16 units

Khasra Details

Total Area

57344.10

617246.16 ft²

1 plot
Plot
TypePlot
Khasra/Plot No2B
Area(In Sq. Mt.)57344.10

Other Details

Contractor Name (if any)M/s Ahluwalia Contracts (India) Ltd
Contractor Address1, Okhla Industrial Area, Phase-3, Near Modi Mill, New Delhi
Architect NameMr. Sunil Kumar Jha
Architect AddressBPTP Crest, Plot No. 15, Udyog Vihar, Phase-IV, Gurgaon
Architect Licence NumberCA/99/24568
Structural Engineer NameM/s MANISH CONSULTANTS
Structural Engineer AddressF-19, Ground Floor, South City - 2, Sector-50, Gurugram – 122018
Mobile number(Project Co-ordinator)9818002513