Demarcation for an area of 9075 Sq. M. completed at site.
Boundary wall for an area of 9075 Sq. M. is under construction & shall be completed soon.
Road work shall be completed after completion / laying of external services.
Footpaths shall be completed after completion / laying of external services.
Internal / external water supply system shall be Completed by Mar-19 (proposed) & the connection for the same from Noida authority shall be done after obtaining OC for the project. The water supply/ drinking water will be made available by Noida authority after OC of the building
External / Internal sewage system shall be completed & connection for overflow of Excess raw sewage shall be obtained from Noida authority after OC of the building. The civil work of STP is completed and installation of electro mechanical system shall be completed by Mar-19 (proposed).
External strom water drainage system for the building shall be completed by Mar-19 (proposed) & connected for overflow of drain Water shall be provided by Noida authority after obtaining OC of Building.
Green / landscape area shall be provided as per norms /by laws.
Tree Planting shall be provided /completed after completion of external development work as per norms /bylaws .
Design for electric supply including street lighting Shall be provided / completed by Mar-19 (proposed). The connection from electrical department Noida for the same will be obtained after obtaining OC certificate. The electrical supply shall be provided by concern electrical department Noida.
Not applicable.
STP has been provided for adequate capacity and the civil work for the same has been completed. Installation electro mechanical system shall be provided / completed amd connection for overflow of excess sullage water shall be obtained from Noida authority after obtaining OC of the building.
Solid Waste Management And Disposal System shall be provided as per Norms/bylaws.
Rain water harvesting as per norms / bylaws.
Street lighting with solar photovoltaic shall be provided / completed. Solar system installation is under progress.
Fire protection and fire safety system shall be provided / completed as per approved fire lightning scheme.
As per Norms / bylaws.
Emergency Evacuation Services shall be provided as per approved building sanction plan.
Other Miscellaneous Work will provided the required development work as per norms / bylaws.
Showing 1 blocks with 16 units
Total Area
3165.00 m²
34067.74 ft²
Total Units
146
1 different types
Blocks & Floors
1
16 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
57344.10 m²
617246.16 ft²