Project Area
Launch Date
Completion Date
RERA ID
26 46 32.5 N
80 54 08.8 E
YES
YES
INTERNAL DRIVEWAY IN PROGRESS , WELL CONNECTED TO EXTERNAL 24 MT ROAD
I N PROGRESS
SUPPLY FROM RCC TANK FROM TERRACE TO EACH FLAT
CONNECTED TO EXISTING TRUNK SEVERLINE
THROUGH EXTERNAL DRAIN
YES
YES
YES
NO
CONNECTED TO EXISTING TRUNK SEVER LINE WHICH IS FINALLY DISPOSED TO STP
TROUGH PRIVATE VENDOR
PROVISION OFRAIN WATER HARVESTING
NO
YES
NEARBY DEVELOPED SCHEME
YES
PASSENGER AND CARGO LIFT , TELEPHONE CONDUITING ETC
No: SANCTIONED COPY OF PROJECT(IN DEVELOPED LDA MANSOROVER SCHEME) | Date: 22-08-2015
Showing 3 blocks with 18 units
Total Carpet Area
5133.60 m²
55257.56 ft²
Total Units
60
2 different types
Blocks & Floors
3
6 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
3800.00 m²
40902.82 ft²