Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau

Lucknow, Uttar Pradesh
15-04-2025Completion
NewType
LucknowDistrict
37645 LCost

Basic Details

Project Type:New
Project Category:Residential
Total area in round figure (Sq.mt.):25797
Project Name:Belvedere Court - 3 (GH-10 & 11) Integrated Township Baghamau
Registration Fee (in Rs.):134000
Address:Not specified
Village/Locality/Sector etc.:Not specified
State:Uttar Pradesh
Project Duration (In month):61
District:Lucknow
Original Start Date:-
Tehsil:Lucknow
Proposed Start Date:15-04-2020
Sanctioning Competent Authority:Lucknow Development Authority
Project Cost (in Lacs):37645
Proposed Completion Date:15-04-2025

Location

Latitude

26.825984

Longitude

81.023957

Bank Details

Account no.:50200025439234
Name Of Account Holder:ANS Developers Private Limited
Bank Name:HDFC Bank
Branch Address:Gomti Nagar, Lucknow
Branch Name:Vibhuti Khand 
IFSC Code:HDFC0004805

Development Works

Demarcation of Plots

This is single plot polygon shaped , having total 1 no. of entry gate and 1no. of exit gate from the 18m wide front road, Site is surronded by other plots of developers from three sides and one side by Baghamau village.

Boundary Wall

1.8 - 2.1m high and 200 mm thick Boundary wall designed . Brick Work of 9inches and rcc work in column and beam may be used as per design. MS Broad entrance and exit gates are developed with boundary.

Road Work

Trimix road will be used as per deisgn suggested by the Architect for internal road.

Footpaths

All internal roads will have narrow footpath with matt finish tiles pavers or equivalent finishes

Water Supply Including Drinking Water Facilities

Ground water may also be used, Also end user shall be used their individual RO system as per their requirement. Overhead tanks shall be provided on building terrace for distribution through gravity.

Sewer System

Centralized Sewerage system shall be Provided. All Sewerage water shall be go to the STP for treatement. after treatement ,water shall be recycled and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Drain

Storm water system shall be Provided. Storm water from Roads and other lanscape area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain line.

Parks

There many green/ ladscape area in front/ beside of building including green parks, play areas for childrens and different recretional activities.

Tree Planting

There are diffrent type of tree plantation is proposed at site in order to maintatin greenary and natural view.

Design For Electric Supply Including Street Lighting

We have designed the system as per local electricity Board and consider centralized Transformer,HT panel,LT Panel,Feeder Pillar and DG back for common service like External lighting,STP,Pump room etc.

Community Buildings

Fully centralised AC Club House/community center is provided, swimming pool and some temporary kiosks on the central atrium with sitting area of each building.

Treatment and Disposal System of Sewage and Sullage water

Centralized Sewerage system shall be Provided. All Sewerage water shall go to the STP for tretement after treatement ,water shall be recycle and it will use in gardening, flush tanks and vehicle washing, oveflow from the STP shall be connect with the Municiple sewarage system.

Solid Waste Management And Disposal System

There are a proper garbage collection area provided for the solid waste management.

Water Conservation System

A well designed rain water harvesting system shall be provided for the whole building complex to conserve water.

Energy Management System Including Use of Renewable Energy

We will use LED lights fitting in external area as well as solar lights. In STP and Pump room all the equipment shall have energy efficient motor. 25 % of Terrace is covered with Solar Voltaic Panels to provide Renewable source of energy for common areas in building complex.

Fire Protection And Fire Safety System

Since the building is less than 75m in height all the fire norms shall be followed as NBC and approval of fire department

Social Infrastructure And Other Public Amenities Including Public Health Services

Sewerage ,Storm water and water supply system shall be Provided. We have Proposed common Pump Room with Primary filteration, Transfer pumps to fill the domestic overhead tank. Water for domestic use & Flushing go down through gravity from domestic as well as flushing tanks. All Sewgage shall be go to the STP for recycling the water. Storm water for Roof,Roads and other area shall be connect to the Storm water drain channel and go to the Rain water harvesting Pit for recharge the Ground water and overflow shall be connect with Municiple drain.

Emergency Evacuation Services

Fire Staircase is provided in the each building, with fire resistant doors, basements have 1 (one) accesse and exit in case of emergency

Other Miscellaneous Work

Luxurious entrance lobby in each block, convenience store for day to day small purchasings, lush green shurbs at every vacant space on ground.

New Documents

Sale Deed

No: 438 | Date: 12-01-2016

Sale Deed

No: 6137 | Date: 16-04-2014

Registry Document

No: 5396 | Date: 18-04-2015

Registry Document

No: 9652 | Date: 24-06-2015

Sale Deed

No: 11383 | Date: 27-07-2013

Registry Document

No: 4798 | Date: 09-04-2015

Sale Deed

No: 7548 | Date: 14-08-2006

Sale Deed

No: 8785 | Date: 06-07-2011

Uploaded Documents

Proforma of Completion Certificate(Occupancy)

CA CERTIFICATE

Details of Encumbrances

Uploaded: 22-03-2020

Commencement Certificate

Uploaded: 19-10-2021

Other Plan(If Any)

Uploaded: 28-07-2020

Proforma of Application Form

Uploaded: 22-03-2020

Proforma of Allotment Letter

Uploaded: 22-03-2020

Proforma of Conveyance Deed

Uploaded: 22-03-2020

Waste Disposal Plan

Uploaded: 22-03-2020

Water Supply Plan

Uploaded: 22-03-2020

Electricity Supply Plan

Uploaded: 22-03-2020

Development Work Plan

Uploaded: 22-03-2020

Affidavit

Uploaded: 22-03-2020

ARCHITECT CERTIFICATE

Uploaded: 22-03-2020

ENGINEERS CERTIFICATE

Uploaded: 22-03-2020

Permits

Orignal Permit NoMAP-20191205120711677 & MAP-20191205105743450
Orignal Permit Date11-12-2019
Valid Upto10-12-2024
Permit Extendable Upto10-12-2027
End Date15-04-2025

Project Team

Contractor Name (if any)B.B. Realtech Pvt. Ltd.
Contractor Address"SF-20, Cross River Mall, Plot No. 9B & 9C Shahdra, Delhi-110032"
Architect Name42 MM Architecture
Architect AddressD-102 Chhatarpur, New Delhi-110074
Architect Licence NumberCA/2011/53000
Structural Engineer NameMr. Sanjeev Jain
Structural Engineer Address"I- 1738, Chittaranjan Park, New Delhi - 110019"
Mobile number(Project Co-ordinator)9307509002

Project Land Details

AFS

Showing 6 blocks with 228 units

Property Summary

Total Area

51381.93

553069.96 ft²

Total Units

319

5 different types

Blocks & Floors

6

24 floors across all blocks

Parking

0

0 garages, 0 open

Average unit size:161.07
Balconies:1063
Parking ratio:0.00 per unit

Block Tower A1

44 units

Block Tower A2

44 units

Block Tower A3

44 units

Block Tower C

18 units

Block Tower B1

39 units

Block Tower B2

39 units

Khasra Details

Total Area

24.00

258.33 ft²

2 plots
Khasra
Type:Khasra
Khasra/Plot No:306P, 308P, 310P, 311P, 312P, 314P, 315KA P, 315KHA P, 316P
Area(In Sq. Mt.):8,927.43
Khasra
Type:Khasra
Khasra/Plot No:304P, 306P, 312P, 313P, 314P, 315KA P, 315KH P, 316P, 317KA P, (317KH P- Land Acq. Prop.), 318, 319, 320P, 321KA P, 321KHA P, 321GA P, 324KA P, 324KHA P
Area(In Sq. Mt.):16,869.09

Other Details

Contractor Name (if any):B.B. Realtech Pvt. Ltd.
Contractor Address:"SF-20, Cross River Mall, Plot No. 9B & 9C Shahdra, Delhi-110032"
Architect Name:42 MM Architecture
Architect Address:D-102 Chhatarpur, New Delhi-110074
Architect Licence Number:CA/2011/53000
Structural Engineer Name:Mr. Sanjeev Jain
Structural Engineer Address:"I- 1738, Chittaranjan Park, New Delhi - 110019"
Mobile number(Project Co-ordinator):9307509002