Project Area
Launch Date
Completion Date
RERA ID
26.9086
80.345490
Demarcation of plots will be done after all the development work is completed
Boundary wall is not proposed at development site.
Road will be constructed as per sanctioned layout plan. Earth filling work sub grade prepration , GSB Laying and WMM laying and finally BM SDBC/ Premix work will be done in stapwise construction/ development program.
Footpaths will be made as per requirement.
water supply through overhead water tank already constructed nearly sector B.
Sewer system with STP proposed. Sewer will be constructed undrground which will be linked with the main trunck sewer at adjcent main road STP is proposed at sector N for Basant Kunj Yojna.
Drain system will also be constructed as per sanction layout plan according to specification.
All the parks will be constructed as per sanctioned layout plan according to specifications.
Tree will be planted all over the colony after completing the development work of the project.
Electrication work is proposed, provison of 33/11 KV 2X5 MVA Electric sub station, street lighting on each external road through electric pole.
Not Proposed
STP plan has proposed at sector N. Basantkunj for disposal of sector N proposed site sewage will be disposed to adjcent main trank sewer line already laid at adjcent main road.
Solid waste management and disposal system has been already proposed to adjcent sector of Basantkunj there for SWM will be done at nearby site.
Yes provision of disposal of drain/ storm water through Rain Water Harvestin.
NA
NA
Area Reserved for Educational, Nursing Home, health Center and Commercial Plots.
NA
NA
Showing 1 blocks with 4 units
Total Carpet Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
85713.12 m²
922607.45 ft²