28.173135
77.332753
The plot has 28783 Sqm. of the area that will be demarcated as per the sanctioned and survey drawing.
A boundary wall of ( approx 230 m running length) and 2.8 meter earthquake - resistant Rcc/ brick with plaster and railing will be prepared .
all the roads in the complex will in combination of concrete pavers of different colours , shapes, thickness . roads to all towers will be provided and will be designed to take up live load as per approvals .
All footpaths in the complex will be in combination of concreate pavers of different colours , shapes , thickness of 65 mm and 80 mm . designed a footpath in the plaza as a walkway and track .
YEIDA authority shall supply water for the entire society and shall be treated and pumped to all the houses.
Centralized STP to treat the sewage will be designed and provided .
Rain water drains will be provided as per the design to carry all the rainwater of the complex in a ring line , the same will be connected to rain water harvesting pits.
beautiful parks will be made for all residents to enjoy . the parks will have relaxing and enetrtainment zones along with spaces meant for senior citizens , kids and enjoyment.
As per the approved building plan , an apt no. of trees will be provided. the trees will be a mix of evergreen and flowering trees. there will be theme tree.
power supply from electricity board and street lighting as per approved building plan .the lighting will be adequate to lit up the dark spaces and all pathways as well as driveways .
the club will will be made as per the approved building plan and it will have all the modern facilities .social gathering places are also being provided .the residents will be able to enjoy in the club as a place for social gathering and relaxation.
Centralized STP to treat the sewage . The STP will treat all the sewage generate from the society and will be maintained properly .
Collection , storage and disposal will be done as per sanction .collection of the solid waste in the segregated system will be done so that the recyclable.
Rain water harvesting system is being provided to conserve rain water and dual flush system will also be provided with water saving fittings .
Usage LED lights will be used all over the project and the use of the solar lights will also be explored.
As per the approved building plan , we design the best fire protection system consisting of sprinkler , smoke detectors and fire alarms.
Social gathering places are being provided in the club area .these places will be spread over the whole complex and residents will be able to enjoy the same . Swimming pool ,gym , indoor play area , playing courts all these facilities will be provided in the complex
As per the approved building plan and fire approvals , fire staircase are being provided . all fire exit passage shall be kept clear all the time and proper audit as well as fire drills will be done in the society .
As per approved building plans . any and all the works will be done to make the project very comfortable and of good quality for all the residents . the water bodies will be made in the complex to make it look moe beautiful as well as a place to feel calm and relaxed.
Showing 33 blocks with 284 units
Total Area
84701.00 m²
911713.09 ft²
Total Units
547
4 different types
Blocks & Floors
33
35 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
28783.00 m²
309817.33 ft²