27.086764
77.973217
Residential Plots of different sizes as per Building Bylaws 2018 (Amended 2011,2016 & 2018) and demarcated on approved map and accordingly the demarcation will be done on the site.
N.A.
Different Roads Proposed for Entire Township is of 7 mtr, 9 mtr, 12 mtr, 18 mtr, 24 mtr, 30 mtr, 36 mtr & 45 mtr and entire township is well connected with 36 mtr road. Design is based of Flexible Pavement.
A pedestrian walkway is proposed as an integral component of the township development, aimed at promoting walkability and ensuring safe, accessible movement for residents. Footpaths are made with Paver Block having a thickness 80mm. Pedestrian walkway of about 2.0 mtr width at each side of 24 mtr, 30 mtr, 36 mtr & 45 mtr roads. Pedestrian walkway of about 2.75 mtr width at each side of 18 mtr Road. Pedestrian walkway of about 2.5 mtr width at each side of 12 mtr Road. Pedestrian walkway of about 1.5 mtr width at each side of 9 mtr Road. A dedicated cycle track is proposed as part of the township development to promote healthy lifestyles and provide a safe and convenient route for cyclists throughout the area. Cycletrack of about 2.5 mtr width at each side of 45 mtr road. Cycletrack of about 2.0 mtr width at each side of 24 mtr, 30 mtr and 36 mtr road. Cycletrack of about 2.0 mtr width at each side of 18 mtr road.
The potable water shall be supplied to each plot by pumping from Semi Underground Tank. The water demand is estimated based on proposed land use, built-up area and the population proposed. HDPE PE-100 PN-10 upto 200mm and DI, K9 pipes above 200mm are considered and designed the distribution network. The Minimum Pipe Dia is 90mm & Maximum Dia is 600mm for the system.
Sewer appurtenances such as manholes, drop manholes will be provided at appropriate locations along the sewerage network in accordance with the CPHEEO guidelines and design considerations. Size of Manholes to be used: 0.9 m to 1.80 m dia for depth from 1.65 m to 9 mtr.
The recycled water shall be supplied to each plot by pumping from Semi Underground Tank. The Water Quality Standards after treatment of the raw water from the existing source shall be as per the Bureau of Indian Standards IS: 10500-1991. The proposed pipe materials are HDPE PE-100 PN-10 upto 200mm and DI, K9 pipes above 200mm.
Park and all green areas have been demarcated in the layout. Actual horticulture work shall be started after completion of civil work.
As per the Sanctioned plan
To ensure a safe, reliable, and aesthetically pleasing power distribution system within the township, an underground cabling system is proposed through dedicated trench for the electricity supply network. To catre the electrical demand 1 No of 33/11 kv substation, capacity 2X10 MVA is proposed and to ensure the electricity at consumer/allottee end various 11/0.433 kV substation is proposed.
N.A.
As per the Sanctioned plan
Places has been demarked and created for GCC (Garbage Collection Centre)
echargewellswithdesiltchamberhasbeenmadeintheparksofsize 160mmdiaand100meterdeep,builtbyISImarkrigidPVCOclass-500s/s pipe
N.A,
N.A,
Public & Semi Public Facilities is being demarcated as Nursery School, Health Centre, Junior High School Integrated, Marriage Community Centre & Club.
N.A,
N.A,
Showing 1 blocks with 6 units
Total Area
0.00 m²
0.00 ft²
Total Units
0
1 different types
Blocks & Floors
1
1 floors across all blocks
Parking
0
0 garages, 0 open
Total Area
585191.92 m²
6298947.26 ft²